Similar Projects
Hemphill Creek 12-inch, 24-inch, 27-inch Wastewater Main - 564 - City of San Marcos
Infrastructure
Conception
$8,400,000 CJ est. value
San Marcos, TX 78666

Harris Hill Road Water Line - 660 - City of San Marcos
Infrastructure
Conception
$2,350,000 CJ est. value
San Marcos, TX 78666

Luxe of Buda
New Construction, Infrastructure - 7,066 SF
Design
$750,000 CJ est. value
Buda, TX 78610

Pollo Campero / Austin
New Construction, Infrastructure - 2,582 SF
Design
$2,100,000 CJ est. value
Austin, TX 78748

Loop 82 and Bobcat Stadium
Infrastructure
Post-Bid
$68,931 CJ est. value
San Marcos, TX 78666

RFQ Engineering - Parks and Recreation Architectural and Engineering Design Services Garison Park
Infrastructure, Renovation
Post-Bid
$500,000 CJ est. value
Buda, TX 78610

Stephenville Metal Building
New Construction, Infrastructure
Results
$37,146 CJ est. value
Austin, TX 78701

Fire Training Facility
New Construction, Infrastructure - 4,529 SF
Results
$2,777,777 CJ est. value
San Marcos, TX 78666

Capitol Complex, Phase 2
New Construction, Infrastructure
Construction
$225,000,000 CJ est. value
Austin, TX 78701

Sunfield WWTP Expansion to 0.99 MGD - Package 3A
Addition, Demolition, Renovation, Infrastructure
Construction
$25,000,000 CJ est. value
San Marcos, TX 78666

Engineering Discovery Building - CMAR
New Construction, Infrastructure
Pending Verification
$169,650,000 CJ est. value
Austin, TX 78712

Z'Tejas - Dry River District / Kyle
New Construction, Infrastructure - 4,725 SF
Pending Verification
$2,500,000 CJ est. value
Kyle, TX 78640

Bebee Road (From Intersection of IH35 Frontage Rd/Bebee Rd to Intersection of Bebee Rd/Goforth Rd) - City of Kyle
Infrastructure
Conception
$32,700,000 CJ est. value
Kyle, TX 78640

Bobcat Buda
New Construction, Infrastructure - 11,324 SF
Design
$1,300,000 CJ est. value
Buda, TX 78610

Proposed Ranch Road 12 Wastewater Improvements
Infrastructure
Post-Bid
$500,000 CJ est. value
San Marcos, TX 78666

Last Updated 08/15/2023 09:08 AM
Project Title

Bobcat Stadium End Zone Complex Expansion - Texas State University

Physical Address View project details and contacts
City, State (County) San Marcos, TX 78666   (Hays County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Site Development, Stadium
Contracting Method Competitive Bids
Project Status Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $37,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new 7,600 GSF weight room and nutrition center which includes a new alumni pavilion and deck on the roof of the building. Interior renovations include expansion to the existing locker room, new breakout team rooms, new player lounge, a new third level donor suite, installation of a new elevator, and connections to the east and west concourse levels. The design and construction team selected will be required to provide the University with ideas, concepts, options, and constructability management objectives to enhance the published feasibility documents and provide cost value recommendations to the project. As of August 14, 2023, the project is in design phase. The construction documents completion timeline has not been released. A tentative bid schedule for contractors has not been disclosed. Construction start is anticipated December 2023 and the completion timeline is scheduled for July 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents