Similar Projects
Nature Trail Construction
Post-Bid
Claremont, NH 03743

Rehabilitation of Barn Door Gap Road Bridge over Big River (NHDOT Bridge No. 057/137)
Post-Bid
Strafford, NH

Roxbury Street Bridge Replacement
Results
Less than $1,400,000 est. value
Keene, NH

State Aid Highway Project NH Route 3A & Dunklee Road Intersection Improvement & State Aid Bridge Project Dunklee Road Bridge Rehabilitation Over Bow Bog Brook
Results
$1,800,000 to $2,100,000 est. value
Bow, NH

Lift Bridge PLC Services
Term Contract
Post-Bid
Concord, NH 03302

Bunker Hill Road Bridge Replacement over Mill Brook
Results
$500,000 to $550,000 est. value
Tamworth, NH

Electrical Inspection, Maintenance and Repair for Bridges
Post-Bid
Concord, NH 03302

Queen City Bridge Rehabilitation
Results
Manchester, NH

Expanding Polymer Injection
Post-Bid
Sanbornton, NH 03269

Snow Road Bridge 165/112 over South River
Results
Less than $275,000 est. value
Effingham, NH 03882

Dougherty Lane Bridge Repair over the Middle Branch Piscataquog River
Post-Bid
New Boston, NH

Bunker Hill Road Bridge Replacement
Results
$360,000 to $400,000 est. value
Hill, NH

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Goffs Falls Road Bridge Replacement
Results
Manchester, NH

Bridge Repairs - Market Street, Kearsarge Way Bridge Repairs
Results
$1,400,000 to $1,600,000 est. value
Portsmouth, NH

Last Updated 06/15/2021 09:53 AM
Project Title

Rehabilitation of the Whitter Covered Bridge Over the Beaucamp River

Physical Address View project details and contacts
City, State (County) Ossipee, NH 03864   (Carroll County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000 to $900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Ossipee is proposing to complete the rehabilitation of the Whittier Covered Bridge. This is the third and final phase of the project which will re-erect the bridge over the Bearcamp River in its original location founded on modified stone abutments. This project also includes activities to restore and stabilize the south riverbank. The new riverbank will be stabilized using a combination of rounded stone and vegetation to utilize native materials and retain a natural appearance once vegetation becomes established.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents