Similar Projects
Hale Park Improvements - County of Ionia
Infrastructure
Design
$382,000 CJ est. value
Ionia, MI 48846

Handlon Correctional Facility - Paving Improvement Project
Infrastructure
Bidding
$600,000 CJ est. value
Ionia, MI 48846

Handlon Correctional Facility - Paving Improvement Project
Infrastructure
Bidding
$600,000 CJ est. value
Ionia, MI 48846

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Branch Street Reconstruction
Infrastructure
Post-Bid
Ionia, MI 48846

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Jones and Morse Street Reconstruction
Infrastructure
Results
Ionia, MI 48846

I-96 From Bliss Road East To Sunfield Highway Rebuild
Demolition, New Construction, Infrastructure
Pending Verification
$81,310,000 CJ est. value
Portland, MI 48875

I-96 From Bliss Road East To Sunfield Highway Rebuild
Demolition, New Construction, Infrastructure
Pending Verification
$81,310,000 CJ est. value
Portland, MI 48875

Ionia Eastbound Scale - Demolish and Construct a New Weigh Station
Demolition, New Construction, Infrastructure
Post-Bid
$4,800,000 CJ est. value
Ionia, MI 48846

Water Main System Improvements, Contract B
Alteration
Results
$1,733,142 est. value
Muir, MI

2022 Bond - Belding School District
Renovation, Infrastructure
Pending Verification
$21,500,000 CJ est. value
Belding, MI 48809

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

0.72 MI of Hot Mix Asphalt, Crush, Shape and Resurface, Aggregate Base, Sewer, Drainage, Sidewalk, Watermain and Pavement Markings on Plain Street from Maple Road To Superior Street Then West on Superior Street to Liberty Street
Infrastructure
Results
Muir, MI

Wastewater System Improvements
Infrastructure, Renovation
Post-Bid
$2,000,000 CJ est. value
Portland, MI 48875

Last Updated 05/06/2023 10:31 AM
Project Title

Hot Mix Asphalt Shared-Use Path and Pavement Markings on French Fry Lane

Physical Address View project details and contacts
City, State (County) Lake Odessa, MI 48849   (Ionia County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $221,845 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

0.20 mi of hot mix asphalt shared-use path and pavement markings on French Fry Lane from Jordan Lake Avenue to French Fry Lane, Ionia County. This is a Local Agency project. This is a Small Business Program project. Only those approved by MDOT as a Small Business may be eligible to bid as a prime contractor. Net classification required for this project is 143 Ea In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Cb. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No TAL 34000 217135A 23A0440 MI DOT - 2305 044 - Hot Mix Asphalt Shared-Use Path and Pavement Markings on French Fry Lane

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents