Similar Projects
HVAC System Replacement Project - Camelot Elementary School
Alteration
Bidding
$3,200,000 est. value
Chesapeake, VA 23323

HVAC Services- DMV Norfolk-Widgeon Road CSC
Post-Bid
Chesapeake, Norfolk, VA 23513

HVAC and Mechanical Products
Term Contract
Post-Bid

Roof Top Air Handling Unit
Results
Chesapeake, VA 23323

HVAC Replacement - Portlock Primary School Media Center
Results
Chesapeake, VA

Air Purification Systems
Post-Bid
Chatham, Pound, Victoria, VA 23936

Rooftop Unit, RTVAV-8 HVAC Replacement - Greenbrier Middle School
Results
Chesapeake, VA

HVAC Maintenance and Repair
Post-Bid
Chesapeake, Portsmouth, VA 23322

Kitchen Hood Exhaust Fan Replacement - Treakle Elementary School
Results
Less than $26,614 est. value
Chesapeake, VA

Armstrong SF665DW Heater Replacement Parts
Post-Bid

Kitchen Exhaust Fans, Make-Up Ait Units and Hot Water Heater Replacement - Deep Creek High School
Results
Less than $79,900 est. value
Chesapeake, VA 23323

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Chiller Replacement - Sparrow Road Intermediate School
Results
Less than $249,875 est. value
Chesapeake, VA 23325

Fire Station Ventilation Systems
Alteration
Post-Bid
Chesapeake, VA

Roof and Partial HVAC Replacement - Butts Road Intermediate School
Results
Less than $3,813,000 est. value
Chesapeake, VA 23322

Last Updated 12/07/2021 03:37 PM
Project Title

HVAC Partial Equipment Replacement Project - Greenbrier and Jolliff Middle Schools

Physical Address View project details and contacts
City, State (County) Chesapeake, VA 23321   (Chesapeake City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 11/01/21
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the removal and replacement of mechanical equipment, electrical power to the units, selective demolition, building finishes (flooring, base, and ceilings), structural steel modifications to accommodate mechanical equipment, selective removal, and replacement / connections to existing built-up roofing system associated with new rooftop equipment, and masonry exterior wall selective demolition and new masonry toothing relating to mechanical equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents