Similar Projects
Pavement and Structure Rehabilitation
Bidding
NC

Milling, Resurfacing, and Shoulder Grading
Bidding
NC

East Village Infrastructure
Post-Bid
$7,686,825 est. value
Charlotte, NC

Camp North End CIP Improvements
Post-Bid
Charlotte, NC

Construction of the Walker Branch Greenway (South Tryon to Smith Road)
Results
Charlotte, NC 28273

2019 Pavement Repair and Resurfacing Project
Results
Less than $392,000 est. value
Stallings, NC

Lakeview Road Improvements - Clearing of Utilities
Bidding
$20,000 to $40,000 est. value
Charlotte, NC 28272

Construction of Bailey Road and Highway 115 Intersection Improvements
Post-Bid
Cornelius, NC 28031

Resurfacing FY 2020
Results
Less than $5,472,000 est. value
Charlotte, NC

Asphalt Rejuvenating Application Services FY20
Post-Bid
Charlotte, NC 28202

Specialized Roadway Construction Services FY20D
Results
Less than $1,660,945 est. value
Charlotte, NC

Blue Ridge Parkway
Post-Bid
$85,000,000 est. value

Specialized Roadway Construction Services FY20C
Results
Less than $1,660,945 est. value
Charlotte, NC

Westinghouse Multi-Use Path
Post-Bid
$4,079,410 est. value
Charlotte, NC

Pavement and Bridge Rehabilitation
Results
NC

Reported 02/15/2020 12:00 AM
Project Title

Construction Manager for UNC Charlotte East Village Infrastructure

Physical Address View project details and contacts
City, State (County) Charlotte, NC   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $6,000,000
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

The phased project will realign John Kirk Drive and Cameron Boulevard on and adjacent to the UNC Charlotte campus near Highway 49. The scope of work also includes a new signalized intersection at the East Entrance into campus, signalized improvements at Highway 49 and John Kirk Drive, new landscaped center medians, sidewalks, landscaping and pedestrian lighting. Historically Underutilized Business (HUB) participation goal is 15%

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 26 - Electrical, Lighting, Exterior Lighting, Roadway Lighting, Walkway Lighting.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents