Similar Projects
D/B Western MATOC
Design
$1,000,000 to $70,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Design

CMHIP Building 121 Suicide Mitigation, Ceilings and Restrooms
Renovation
Bidding
$640,396 est. value
Pueblo, CO 81003

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

New Training Tower Facility
New Construction
Post-Bid
Pueblo, CO

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Facilities Maintenance-Multiple Award Task Order Contract (MATOC)
Results
Less than $24,900,000 est. value

Pueblo Water Facilities Building Replacement
Results
Pueblo, CO 81003

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Construction Inspection IDIQ
Post-Bid
$50,000 to $17,500,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Z--Annex 1502000 Facility Investment Annex 1602000 Electrical
Post-Bid

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Afb - Building Rehabilitation: St Mary-Corwin Medical Center
Post-Bid
Less than $6,000,000 est. value
Pueblo, CO 81004

Y--BLM-CO-NWD- Little Snake FO - Office Remodel
Renovation
Design
$25,000 est. value
Craig, CO 81625

Last Updated 03/27/2020 05:42 PM
Project Title

F2 and F3 Cottage Renovation CMHIFL Phase 1 of 1

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81003   (Pueblo County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of services will include assistance to the State during the process of Design Development, construction, and warranty period. Specific tasks to be performed by the Construction Manager/General Contractor (CM/GC) include those generally performed by the CM/GC construction community where the Construction Manager is also the Contractor. A sample copy of the State’s CM/GC contract is contained within the RFP. A Guaranteed Maximum Price (GMP) will be required at the completion of Design Development phase.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents