Similar Projects
Kemmerer to La Barge Oyster Ridge / US 189
Infrastructure
Conception
$6,960,000 CJ est. value
Big Piney, WY 83113

Kemmerer to La Barge Oyster Ridge / US 189
Infrastructure
Conception
$6,960,000 CJ est. value
Big Piney, WY 83113

Ralph Wenz Field: SRE Building Construction
Renovation, Infrastructure
Design
$235,000 CJ est. value
Pinedale, WY 82941

Ralph Wenz Field: SRE Building Construction
Renovation, Infrastructure
Design
$235,000 CJ est. value
Pinedale, WY 82941

Develop a Water Well and Solar Array at the Soda Lake Wildlife Habitat Management Area (WHMA)
Infrastructure
Bidding
$120,000 CJ est. value
Pinedale, WY 82941

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

WY Flap 704(1) Skyline Drive & Fremont Lake Road
Term Contract
Post-Bid
Pinedale, WY 82941

District 3 Stockpiles
Infrastructure
Results

District 3 Crack Seal
Infrastructure
Results

RFQ Contractor - WY FLAP 704(1) Skyline Drive and Fremont Lake Road
Infrastructure
Pending Verification
$10,000,000 CJ est. value
Pinedale, WY 82941

RFQ Contractor - WY FLAP 704(1) Skyline Drive and Fremont Lake Road
Infrastructure
Pending Verification
$10,000,000 CJ est. value
Pinedale, WY 82941

WY Flap 740(1) Skyline Drive & Fremont Lake Road
Term Contract
Post-Bid
Pinedale, WY 82941

Milling Plant Mix, Bituminous Pavement Surfacing and Miscellaneous Work
Infrastructure
Results

Gravel, Grade and Apply Magnesium Chloride Dust Control to Rim Road
Infrastructure
Post-Bid
Bondurant, WY 82941

Pavement Surfacing, Rigid Concrete Overlay, Removal of Concrete, Bridge Rehabilitation, Temporary Concrete Barrier, MGS Guardrail, a+b Bidding and Miscellaneous Work
New Construction, Infrastructure
Results

Last Updated 03/02/2023 12:02 AM
Project Title

South Nichols Waterline

Physical Address View project details and contacts
City, State (County) Big Piney, WY 83113   (Sublette County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $510,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of Installation of new water distribution line, valves, fire hydrant, service connections, asphalt pavement, concrete curb and gutter, surface restoration and appurtenances in Big Piney, Sublette County, Wyoming. Questions regarding the Bidding Documents should be directed to Jorgensen Associates by phone at 307-367-6548.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents