Similar Projects
Resthaven Assisted Living Facility Septic System
Bidding
Zolfo Springs, FL 33890

Replacement of Eleven (11) Air Release Valves
Bidding
$165,000 est. value
Port Saint Lucie, FL

Rivertown Kendall Drive - Phase 2
New Construction
Post-Bid
Jacksonville, FL

Private Lateral Line Rehabilitation Project
Post-Bid
Saint Petersburg, FL 33731

On-Call Plumbing/Sewer and Drain Services
Results
Tallahassee, FL 32312

Grand Ridge Sewer Extension Hwy 69
Results
Grand Ridge, FL 32442

Easy Street Force Main Replacement
Bidding
$593,853 est. value
Port Charlotte, FL 33952

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Sanitary Sewer Capacity Improvements
Results
Less than $15,000,000 est. value
Saint Pete Beach, FL 33706

Water and Sewer Monitoring Services
Bidding
Fort Pierce, Jensen Beach, FL 34981

Glades County Community Development Block Grant Project Washington Park Sanitary Improvements
Post-Bid
$550,000 est. value
FL

Wastewater Collection System Repair
Results
Less than $500,000 est. value
North Miami Beach, FL 33162

Holmes Boulevard Force Main Replacement
Bidding
Holmes Beach, FL 34217

Pipeline Pig Service
Post-Bid
Less than $210,000 est. value
Tampa, FL 33601

Grease Trap, Septic Tank and Storm Drainage Pump-Out and Repair Services
Term Contract
Results
Miami, FL

Reported 04/03/2020 12:00 AM
Project Title

US-98 Sanitary Force Main Improvements

Physical Address View project details and contacts
City, State (County) Sebring, FL 33876   (Highlands County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $600,000 to $700,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide construction services to include all labor, material, equipment and incidentals required for the installation of approximately 12,500 LF of 6-inch, 8-inch and 10-inch force mains on US-98 (County Road 700). Work also includes seven directional drill bores at various locations on US-98 between Floral Drive and the Arbuckle Creek bridge.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents