Similar Projects
Campground Development - 459-054 - City of Sioux City
Infrastructure
Conception
$2,550,000 CJ est. value
Sioux City, IA 51101

Leeds Connector - 459-320 - City of Sioux City
Infrastructure
Conception
$250,000 CJ est. value
Sioux City, IA 51101

18th Street Viaduct - 719-071 - City of Sioux City
New Construction, Infrastructure
Design
$800,000 CJ est. value
Sioux City, IA 51105

18th Street Viaduct - 719-071 - City of Sioux City
New Construction, Infrastructure
Design
$800,000 CJ est. value
Sioux City, IA 51105

IBP Ice Center - Locker Room Addition Project
Addition, Demolition, Infrastructure
Bidding
$11,700,000 CJ est. value
Sioux City, IA 51106

Fire Hydrant Cleaning/Painting Project
Infrastructure, Alteration
Post-Bid
Sioux City, IA

29th Street Reconstruction (Jones Street to Cheyenne Boulevard)
Infrastructure
Post-Bid
$6,150,000 CJ est. value
Sioux City, IA 51104

Hma Resurfacing with Milling
Infrastructure
Results
IA

PCC Pavement - Grade and Replace
Infrastructure
Results
Sioux City, IA

SUX Aviation Center Project Rebid
New Construction, Infrastructure - 39,400 SF
Pending Verification
$13,644,584 CJ est. value
Sioux City, IA 51111

Moville Area Medical Clinic
New Construction, Infrastructure - 10,000 SF
Pending Verification
$5,900,000 CJ est. value
Moville, IA 51039

Wastewater Treatment Plant (WWTP) Capacity Expansion - 539-223 - City of Sioux City
Addition, Infrastructure
Conception
$1,310,000 CJ est. value
Sioux City, IA 51101

Plywood Trail - 459-321 - City Of Sioux City
Infrastructure
Design
$2,000,000 CJ est. value
Sioux City, IA 51101

Moville 2nd Street Overlay
Infrastructure
Post-Bid
$350,000 est. value
Moville, IA 51039

HMA Resurfacing with Milling
Infrastructure
Results
Sioux City, IA

Last Updated 06/05/2023 09:04 AM
Project Title

West 8th Street Reconstruction Project Hamilton Boulevard to Sioux Street

Physical Address View project details and contacts
City, State (County) Sioux City, IA 51103   (Woodbury County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $3,084,503 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

No Bids Received Per Owner The project is located on West 8 th Street from Hamilton Boulevard to Sioux Street and includes the reconstruction of West 8 th Street including utilities: sanitary sewer, water main, storm sewer; new sidewalks and fiber conduit. The reconstructed roadway will be 39-foot-wide with parallel parking on both sides. Each bid must be made on a form furnished by the City and must be accompanied by a bid bond, a cashier's check or certified check of an Iowa bank or a bank chartered under the laws of the United States, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to ten percent (10%) of the amount of the bid, made payable to the City Treasurer of the City of Sioux City, Iowa. The check or draft may be cashed by the City Treasurer as liquidated damages in the event the successful bidder fails to enter into a contract within the ten (10) days after notice of award and post bond satisfactory to the City ensuring the faithful fulfillment of the contract. The contract will be awarded to the lowest responsive, responsible bidder. However, the City reserves the right to reject any or all bids, re-advertise for new bids and to waive informalities that may be in the best interest of the City. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the state of Iowa and to Iowa domestic labor. The Notice of Public Hearing will be published in the Sioux City Journal on October 15, 2022, and October 22, 2022. This project has a late start date of April 17, 2023. The Project shall be completed within 120 Working Days. Work requiring lane closure along Hamilton Boulevard shall be completed within 20 calendar days. The 20 Calendar Day allowance for lane closure shall fall within the 120 overall Working Days for Project completion. As of June 5, 2023, 2023 no new information available

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents