Similar Projects
Site work for a golf course in Laurel, Maryland.
Infrastructure
Conception
$831,000 CJ est. value
Longview, WA 98632

Site work for a golf course in Laurel, Maryland.
Infrastructure
Conception
$831,000 CJ est. value
Longview, WA 98632

I-5/SB Toutle River Bridge - Painting
Renovation, Infrastructure
Design
$4,085,000 CJ est. value
Castle Rock, WA 98611

I-5/SB Toutle River Bridge - Painting
Renovation, Infrastructure
Design
$4,085,000 CJ est. value
Castle Rock, WA 98611

West Scott Avenue Asbestos Cement Waterline Replacement
Infrastructure
Bidding
$430,000 CJ est. value
Woodland, WA 98674

Cedar Street and 10th Street Sidewalk and 10th Street and Date Street Sidewalk
Infrastructure
Bidding
$383,000 CJ est. value
Kalama, WA 98625

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Pacific Avenue North Half Bridge Replacement Project
New Construction, Infrastructure
Results
Kelso, WA

Waterfront Condominiums
New Construction, Infrastructure
Pending Verification
$15,500,000 CJ est. value
Woodland, WA 98674

Waterfront Condominiums
New Construction, Infrastructure
Pending Verification
$15,500,000 CJ est. value
Woodland, WA 98674

46th Avenue Construction - City of Longview
Demolition, New Construction, Infrastructure
Conception
$3,650,000 CJ est. value
Longview, WA 98632

Beacon Hill Reservoir
Infrastructure
Design
$300,000 CJ est. value
Kelso, WA 98626

Ostrander Road Culvert Replacement Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Kelso, WA 98626

Last Updated 04/11/2023 01:04 AM
Project Title

SR 504/N Fork Toutle River Kid Valley Bridge - Repair Girders

Physical Address View project details and contacts
City, State (County) Toutle, WA 98649   (Cowlitz County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $2,361,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STIP ID 450426B08 This project will repair damaged girders to extend the service life of the bridge. As of April 11, 2023, this project is in design status. Preliminary engineering has begun and environmental design is expected to be complete in the fourth quarter of 2023. The contract advertisement is expected in first quarter of 2025 and construction is anticipated to be operationally complete in the fourth quarter of 2025. WSDOT - SR 504/N Fork Toutle River Kid Valley Bridge - Repair Girders *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents