Similar Projects
Turtle Mountain Band of Chippewa Indians CORF Facility
New Construction, Infrastructure - 10,000 SF
Design
$3,000,000 CJ est. value
Belcourt, ND 58316

2023 Paving Project Turtle Mountain Band of Chippewa Indians
Infrastructure
Bidding
$6,000,000 CJ est. value
Belcourt, ND 58316

Pavement Marking
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Belcourt, ND 58316

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Belle I and Belle II Apartments
New Construction, Infrastructure
Post-Bid
$14,000,000 CJ est. value
Belcourt, ND 58316

TMBC Utility System Improvements - Belcourt Sewer and Water Phase V
Infrastructure
Results
$6,145,392 CJ est. value
Belcourt, ND 58316

TMBC Utility System Improvements - Belcourt Sewer and Water Phase V
Infrastructure
Results
$6,145,392 CJ est. value
Belcourt, ND 58316

International Peace Gardens - Campus Upgrades
Infrastructure
Pending Verification
$500,000 CJ est. value
Dunseith, ND 58329

International Peace Gardens - Campus Upgrades
Infrastructure
Pending Verification
$500,000 CJ est. value
Dunseith, ND 58329

TMBC Water System Improvements - Highway 43 Corridor Phase III
Infrastructure
Post-Bid
$4,203,177 est. value
Saint John, ND 58369

Houle School Road Construction Project
Infrastructure
Post-Bid
$210,000 est. value
Belcourt, ND 58316

Belcourt Multiplex for Quarters
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Belcourt, ND 58316

San Haven Water Main Replacement
Infrastructure
Post-Bid
$690,000 CJ est. value
Belcourt, ND 58316

RFQ D/B - ND Land Port of Entry
Demolition, LEED Certification, New Construction, Infrastructure - 12,000 SF
Post-Bid
$50,000,000 CJ est. value
Dunseith, ND 58329

Turtle Mountain Band of Chippewa Indians Adult Detention Facility (Belcourt)
New Construction, Infrastructure - 24,712 SF
Post-Bid
$20,000,000 CJ est. value
San Haven, ND 58329

Last Updated 04/13/2023 06:04 AM
Project Title

Turtle Mountain Public Utilities Commission Water System Improvements Hwy 43 Corridor Phase IV

Physical Address View project details and contacts
City, State (County) Saint John, ND 58369   (Rolette County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $6,847,670 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

TMBC Water System Improvements - Highway 43 Corridor Phase 4 The Work includes but is not limited to furnishing and installation of water main by either trenching or horizontal directional drilling, valves, curb stops, flush hydrants, and connections to existing water mains. The project is in the Turtle Mountains of North Dakota. The transmission line to the project is along County Highway 43 from Lake Upsilon Road to Foussard Avenue. Laterals off the project's transmission line are located from 42nd Avenue NE to 45th Avenue NE and from 107th Street NE to 108th Street NE. Est. Value Notes: Estimated cost for Primary Contract, Schedule A Contract 1-11

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents