Similar Projects
Newton Farms Park Improvement - City of West Valley City
Infrastructure
Conception
$625,000 CJ est. value
West Valley City, UT 84128

Develop Maple Meadows II - City of West Valley City
Infrastructure
Conception
$2,800,000 CJ est. value
West Valley City, UT 84120

Olympia Hills
New Construction, Infrastructure
Design
$2,000,000,000 CJ est. value
Herriman, UT 84096

Chrome Works
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Salt Lake City, UT 84101

RFQ Construction Manager - Division of Facilities Construction and Management (DFCM) Construction- University of Utah Health Sciences Campus Office Building
New Construction, Infrastructure
Bidding
$78,439,728 CJ est. value
Salt Lake City, UT 84132

SLC DPU - New WRF Construction
New Construction, Infrastructure
Bidding
$60,000 CJ est. value
Salt Lake City, UT 84111

Bueno Avenue Apartments
New Construction, Infrastructure
Post-Bid
$24,000,000 CJ est. value
Salt Lake City, UT 84102

Huntsman Mental Health Institute Utah Translational Research Facility
New Construction, Infrastructure - 185,000 SF
Post-Bid
$105,000,000 CJ est. value
Salt Lake City, UT 84108

Wireline and Perforation Equipment and Services
Infrastructure
Results
Salt Lake City, UT

Drilling Rig and Equipment Forge
Infrastructure
Results
Salt Lake City, UT 84108

Pura Vita Senior Housing
New Construction, Infrastructure
Construction
$6,000,000 CJ est. value
West Jordan, UT 84088

Gate 39 Reconstruction
Infrastructure, Renovation
Construction
$2,127,962 CJ est. value
Salt Lake City, UT 84116

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

South Main Street Apartments / Salt Lake City
New Construction, Infrastructure - 8,400 SF
Pending Verification
$150,000,000 CJ est. value
Salt Lake City, UT 84101

Develop Phase 1 of New Regional Park - City of West Valley City
Infrastructure
Conception
$5,000,000 CJ est. value
West Valley City, UT 84119

Last Updated 05/23/2023 02:26 PM
Project Title

Phase 2 - Utah State Fairpark Days of 47 Arena Improvements

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84116   (Salt Lake County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Site Development, Stadium
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

DFCM Construction-Fairpark Days of 47 Arena Imprvmnts-Courtesy Posting Ph 2 Construction-23178370 ENTELEN Design-Build, LLC (CM/GC) under contract with the Division of Facilities Construction and Management (DFCM) is requesting bids for the following project: Project Description Move AV rack from announcer room into adjacent IT room. Move video equipment from this rack to the IT room and all associated/required cabling. Move audio equipment from announcer booth bav rack to the existing audio rack in Electrical room 800, and the associated cabling. A conduit underground MAY exist to pull cabling into this room. Stadium improvements include stadium audio system upgrades, additional VIP elevated stadium platforms at the North and South of arena, VIP ground level stadium platforms on the East and West of arena, crossover walkway and stairs. The trades involved in this project include Low voltage electrical Telecom, AV Systems cabling and moving AV systems startup and testing to ensure the system is setup properly. Audio System upgrades, Structural Steel and Decking, fencing. Concrete, footings and flat work. Excavation for concrete work. Scope of work defined by drawings and specification provided by Babcock Design For any questions regarding obtaining the Bid Documents, contact the CM/GC Project Manager, Jonathan Burt, immediately at 801.599.0955 or jaburt@entelen.com. Other than the CM/GC and DFCM, no others are to be contacted regarding this bidding process. Q&A/Pre-Bid RFI's deadline is August 18, 2022 @ 4PM The CM/GC reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the State of Utah. The contract shall be awarded by written notice to the lowest responsive and responsible bidder whose bid meets the requirements and criteria set forth in this invitation for bids. An exception occurs where the requirements of a special preference applies under the Utah Procurement Code.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents