Similar Projects
I-194 over Kalamazoo River Bridge Replacement
New Construction, Infrastructure
Conception
$17,600,000 est. value
Battle Creek, MI 49014

Woodland Park & Nature Preserve - Planning/Improvement - City of Battle Creek
New Construction, Infrastructure, Term Contract
Conception
$1,980,000 CJ est. value
Battle Creek, MI 49017

Hot Water Heaters (Standard and Tankless)
Term Contract
Design
Marshall, MI 49068

Hot Water Heaters (Standard and Tankless)
Term Contract
Design
Marshall, MI 49068

High School and Elementary Improvements
Renovation
Post-Bid
Battle Creek, MI

High School and Elementary Improvements
Renovation
Post-Bid
Battle Creek, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Pothole Patching
Alteration
Results
Marshall, MI

RFP D/B - Hot Mix Asphalt Resurfacing and Reconstruction on I-94
Demolition, New Construction, Infrastructure
Construction
$159,129,390 CJ est. value
Marshall, MI 49068

RFP D/B - Hot Mix Asphalt Resurfacing and Reconstruction on I-94
Demolition, New Construction, Infrastructure
Construction
$159,129,390 CJ est. value
Marshall, MI 49068

Construction for Rehabilitate Taxiway A - City of Battle Creek
Infrastructure
Pending Verification
$4,654,016 CJ est. value
Battle Creek, MI 49015

Construction for Rehabilitate Taxiway A - City of Battle Creek
Infrastructure
Pending Verification
$4,654,016 CJ est. value
Battle Creek, MI 49015

Linear Park Expansion, North Side to South Side - City of Battle Creek
Infrastructure
Conception
$2,500,000 CJ est. value
Battle Creek, MI 49015

Jackson Street Parking Lot Reconstruction - City of Battle Creek
Infrastructure
Design
$1,000,000 CJ est. value
Battle Creek, MI 49037

2021 Series 1 Bond
Renovation
Post-Bid
Battle Creek, MI 49015

Last Updated 03/17/2023 04:34 PM
Project Title

Middle School & Dunlap Elementary Interior Improvements and Pavement Restorations Including High School

Physical Address View project details and contacts
City, State (County) Bedford charter Township, MI 49017   (Calhoun County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Project #3033.5, 3033.6, 3033.7 Project #22008-0C & 0D The Owner is soliciting proposals for qualified bidders to perform work on various portions of the project. Specialty contractors are being solicited at this time for the following: Earthwork Asphalt Paving Site Concrete Fencing Concrete Flatwork Masonry Structural Steel & Deck Carpentry & General Trades Finish Carpentry Millwork Sheet Metal Sealants Hollow Metal Doors & Hardware Wood Doors Hardware Aluminum, Glass & Glazing Fireproofing Drywall & Related Interior Trades Hard Tile Work Acoustic Specialties Resilient & Carpet Athletic Flooring Painting & Wallcovering Partitions Signage Lockers Toilet Partitions & Accessories Manufactured Casework Window Treatments Mechanical Fire Protection Plumbing Insulation Sheet Metal Testing & Balancing Temperature Controls Building Electrical Prevailing wages do not apply to this project. Bid Bond: 5% Payment and Performance Bonds: 100% Contract Completion September 2024

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents