Similar Projects
Last Updated | 06/13/2022 03:28 AM |
Project Title | Foreman High School Boiler Feed Tank |
Physical Address | View project details and contacts |
City, State (County) | Chicago, IL 60641 (Cook County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Disconnect the boiler feed tank from all piping. Remove feed tank and dispose of properly. Fabricate and install new tank with anode rod, sight glass, and clean out. Install on new stand. Reconnect return lines to the upper part of the tank. Repipe the suction side of the pumps to the new tank installing new ball valves and fittings. Fill tank and test system. Install a 2" all thermal insulation jacket to the tank. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |