Similar Projects
Ellsworth - Baldwin Construction / Resurface
Infrastructure
Conception
$7,000,000 CJ est. value
Ellsworth, WI 54011

DeSanctis Park Villas
New Construction, Infrastructure
Design
$16,500,000 CJ est. value
River Falls, WI 54022

Prescott - Ellsworth Constr / Culvert Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Ellsworth, WI 54011

Pierce County Campus - Parking Lot Sealcoating and Striping Project
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Ellsworth, WI 54011

2022 North Interceptor Sewer Lining
Infrastructure
Post-Bid
$402,941 CJ est. value
River Falls, WI 54022

State Patrol Communication Tower Improvements - GPC
Infrastructure
Results
$2,070,271 CJ est. value
Bay City, WI 54723

Boat Launch Dock and Fishing Dock
Infrastructure
Results
$170,300 CJ est. value
Prescott, WI 54021

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Radio Road Apartments
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
River Falls, WI 54022

Pepin - Hager City Constr / Culvert Repair and Replacement
Infrastructure
Design
$750,000 CJ est. value
Prescott, WI 54021

C River Falls, Powell Avenue, Kinnickinnic River Bridge P-55-0148, LOC STR
Infrastructure
Post-Bid
$1,000,000 CJ est. value
River Falls, WI 54022

Sludge Receiving Improvements
Infrastructure, Renovation
Results
$9,363,000 CJ est. value
Ellsworth, WI 54011

2023 & 2024 Manhole Rehabilitation
Infrastructure
Post-Bid
$116,000 CJ est. value
River Falls, WI 54022

Mann Valley Corporate Park
Infrastructure
Results
$13,166,434 CJ est. value
River Falls, WI 54022

400th Street to CTH CC, 450th Ave, Stage 3
Infrastructure
Results
$741,226 CJ est. value
El Paso, WI 54750

Last Updated 06/14/2023 11:13 AM
Project Title

South Pointe 1st Addition

Physical Address View project details and contacts
City, State (County) River Falls, WI 54022   (Pierce County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of single family homes and a twin home. As of June 14, 2023, this project is in the early planning stages, and received recommendation of final plat approval from the River Falls Plan Commission to City Council. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to fourth quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents