Similar Projects
Steel Pipe
Term Contract
Sub-Bidding
Los Angeles, CA 91342

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

As Needed Plumbing Maintenance and Repair for Met In-Town Housing (Multiple Locations)
Alteration
Post-Bid
$240,000 est. value
Los Angeles, CA 90012

Orchard Dale Elementary School Modernization Project- Plumbing
Alteration
Results
Whittier, CA 90603

As Needed Plumbing Maintenance and Repair for Metropolitan`s Gene Pumping Pump Plant
Term Contract
Results
$240,000 est. value
Los Angeles, CA

As Needed Plumbing Maintenance and Repair for Metropolitan's Eagle Mountain Pumping Plant Housing
Term Contract, Alteration
Post-Bid
$240,000 est. value
Desert Center, Los Angeles, CA 90012

Waste and Vent Lines Re-Pipe
Alteration
Results
$25,000 est. value
Los Angeles, CA

As Needed Plumbing Maintenance and Repair for Metropolitan`s Hinds Pumping Pump Plant Housing
Term Contract, Alteration
Post-Bid
$240,000 est. value
Los Angeles, CA 90012

Clamps. FRP Pipe Repair Stainless Steel
Infrastructure
Results
$26,561 CJ est. value
Los Angeles, CA 90012

As Needed Plumbing Maintenance and Repair for Metropolitan's Iron Mountain Pumping Pump Plant Housing
Term Contract
Post-Bid
$240,000 est. value
Los Angeles, CA

Plumbing Services - Los Angeles and Ventura County
Term Contract
Results
$1,155,852 CJ est. value
Los Angeles, CA 90012

Walnut Park - Water Meter Replacement Project
Infrastructure
Post-Bid
$1,600,000 CJ est. value
Huntington Park, CA 90255

Above Ground Storage Tank Replacement
Infrastructure
Results
$295,210 CJ est. value
Pasadena, CA 91101

As-Needed Plumbing Repair Services for Metropolitan's Hinds Pumping Pump Plant Housing
Term Contract
Post-Bid
Less than $95,000 est. value
Los Angeles, CA

North Inglewood Booster Pump 3 Replacement Project
Renovation
Results
$74,000 CJ est. value
Inglewood, CA 90302

Last Updated 03/01/2023 03:36 AM
Project Title

District 22 Trunk Sewers Group 1 Rehabilitation

Physical Address View project details and contacts
City, State (County) Glendora, CA 91741   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,970,379 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of DISTRICT 22 TRUNK SEWERS GROUP 1 REHABILITATION, located in the Cities of Glendora, La Verne, and San Dimas, California. The work consists of rehabilitation of approximately 8,954 feet of existing corroded 12- to 15-inch diameter non-reinforced concrete pipe (NRCP) with cured-in-place pipe liner and approximately 36 manholes with a protective coating system on the Puddingstone Trunk Sewer Sections 1-4 and Base Line Trunk Sewer, and all appurtenant work. All bids must be fully transmitted by the date and time specified . The Districts is not responsible for electronic or Internet Service Provider (ISP) transmission interruptions/delays of any kind. Each bid shall be submitted electronically and must be accompanied by a certified check, cashier s check, or electronic bid bond verified through Surety2000 with an approved surety company as surety, payable to Los Angeles County Sanitation District No. 22 or other authorized security provided by Public Contract Code 20784, for an amount equal to at least ten percent of the amount bid as a guaranty that the bidder, if successful, will enter into a contract satisfactory to the Board of Directors for completing the work contemplated. The electronic bid shall include an electronic copy of a certified check, cashier s check, or the Bidder may provide a bid bond authorization code provided to them by Surety2000, which the Bidder shall keep in effect until the District gives notice that it may be released. If a certified check or cashier's check is used in lieu of Surety2000 bid bond, the original check must be delivered to the District prior to the time of electronic bid opening. The successful bidder must file good and sufficient bonds for the faithful performance of the contract and for the payment of laborers and materialmen. Bonds for the faithful performance of the contract and for the payment of laborers and materialmen that are issued by sureties that are listed in the latest version of the U.S. Department of Treasury Circular 570 and that are authorized to issue bonds in the State of California, and whose bonding limitation shown in the circular is sufficient to provide bonds in the amount of the contract, will be deemed approved unless specifically rejected. Bonds issued by all other sureties are subject to approval by the Board of Directors and must be accompanied by all of the documents enumerated in California Code of Civil Procedure 995.660(a), as amended. At the time of bid, the Contractor shall possess a valid California Contractor s License in one of the following classifications: GENERAL ENGINEERING "A" or "C-34", or C-42 At the request and expense of the Contractor, securities equivalent to the amount withheld from progress payments may be deposited with the District or with a state or federally chartered bank as the escrow agent, who shall, during the performance of the work, hold such instruments in the name of the District, and return such securities to the Contractor upon satisfactory completion of the contract. The option of placing funds in escrow is provided to Contractor pursuant to California Public Contract Code 22300; should that law cease to be effective, Contractor shall not have this option as to any progress payment paid or payable after the date the law ceases to be effective. Securities eligible for investment under this provision include those listed in 16430 of the Government Code or FDIC insured bank or savings and loan certificates of deposit. The Contractor shall be the beneficial owner of any security substituted for monies withheld and shall receive any interest thereon. and the bids will be referred to the Board of Directors at the meeting of the Board to be held at the Office of the Chief Engineer of the District, 1955 Workman Mill Road, Whittier, California, 90601, on December 28, 2022 beginning at 1:30 p.m. The Board of Directors may award the contract for the above described work, either at the meeting of the Board of Directors to be held at the above-stated address, on December 28, 2022 beginning at 1:30 p.m., or at any other meeting of the Board of Directors within 120 days after the date listed above for receipt of bids. The Board of Directors may reject all bids. Unless all bids are rejected, award will be made to the low, responsive, responsible bidder. The work of construction must be completed within 260 WORKING DAYS after the date in the Notice to Proceed. Bidders on this work will be required to comply with the President s Executive Order No. 11246. Department of Industrial Relations Registration and Prevailing Wage Compliance: This project constitutes a public work within the meaning of the California Labor Code (the Labor Code) section 1720 and is subject to the prevailing wage laws. Pursuant to Labor Code sections 1725.5 and 1771.1, all bidders must be registered with the California Department of Industrial Relations (DIR) at the time of bidding, in order to enter into a contract, and to perform any work on the project. Pursuant to section 1771.4 of the Labor Code, the work on this project is subject to compliance monitoring and enforcement by the DIR. Pursuant to provisions of the Labor Code of the State of California, not less than the general prevailing rate of per diem wages and not less than the general prevailing rate of per diem wages for legal holiday and overtime work for each craft or type of workman needed to execute the work contemplated under the agreement, as ascertained by the Director of the Department of Industrial Relations, must be paid to all workers employed on the work by the Contractor or by any subcontractor doing or contracting to do any part of the work. In accordance with Labor Code section 1773.2, the District will have on file copies of the prevailing rates of per diem wages at its principal office and at each job site, which shall be made available to any interested party upon request. Alternatively, general prevailing wage rates may be obtained from the State of California Department of Industrial Relations, Director s Office of Policy, Research and Legislation, Prevailing Wage Unit, at (415) 703-4774 or online. In accordance with Labor Code Section 1773.2, the Contractor shall post a copy of the determination of prevailing rates of per diem wages at each job site. In accordance with Labor Code section 1777.1, any contractor or subcontractor that commits a willful violation or has an intent to defraud under Chapter 1 of Part 7 of Division 2 of the Labor Code (excluding section 1777.5) shall result in that contractor or subcontractor, and any entity in which that contractor or subcontractor has an interest, becoming ineligible to bid on or be awarded a contract for a public works project or perform work as a subcontractor on a public works project. Est. Value Notes: 2,800,000-4,200,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents