Similar Projects
RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Brundage Estates Residential Subdivision
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Meridian, ID 83642

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Prime Earth Pit Reclamation
Infrastructure
Post-Bid
Eagle, ID 83616

Spring Valley Phase 1 Grading
Infrastructure
Post-Bid
$300,000 est. value
Eagle, ID

WRRF Post Aeration Blower Replacement
Renovation
Results
Meridian, ID

Waste Water Recovery Facility (WRRF) Side Stream Phosphorus Treatment Construction
New Construction
Results
$2,000,000 est. value
Meridian, ID 83646

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

Ann Morrison Park Drive / Multi Residential
New Construction, Infrastructure
Construction
$35,000,000 CJ est. value
Boise, ID 83706

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

Idaho Street Mixed-Use Building
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Boise, ID 83702

Cloverdale Road, Victory Road / Overland Road - Ada County Highway District
Infrastructure
Conception
$1,250,000 CJ est. value
Boise, ID 83709

Julia Davis River Node Memorial Construction
Infrastructure
Design
$600,000 CJ est. value
Boise, ID 83702

Boise High Track Replacement Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Boise, ID 83702

Last Updated 05/04/2023 04:01 PM
Project Title

Water Resource Recovery Facility

Physical Address View project details and contacts
City, State (County) Genesee, ID 83832   (Latah County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,281,005 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes Water/Wastewater Infrastructure, Water and Wastewater Facilities The Project includes construction of a new water resource recovery facility to treat the wastewater of the City of Genesee. The new treatment facilities include a new headworks system, three new lined HDPE aerated treatment cells, a tertiary ammonia reduction system, an overland flow treatment system, and a slow rate land application system. Associated with the treatment facilities are two new sewage lift stations with respective force mains and collection system reconstruction and a new outfall to Cow Creek. Tallied results will be provided to all bidders by end of business the next day. $ 3,600,000.00 Estimated value includes base bid only The Project is funded by the Idaho Department of Environmental Quality, the US Army Corps of Engineers, and incorporates funds from the American Rescue Plan Act. The construction contractor must comply with equal employment opportunity, American Iron and Steel, and Davis-Bacon prevailing wage requirements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents