Similar Projects
Reported | 01/14/2020 12:00 AM |
Project Title | Tooele Wind Turbine |
Physical Address | View project details and contacts |
City, State (County) | Tooele, UT (Tooele County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Service contract to provide regularly scheduled maintenance for the GE wind turbine, as well as “as-needed” corrective repair/maintenance services. The GE wind turbine specifics are as follows: Manufacture: General Electric Model: 1.7-103 HH IEC Class Sm, Data Plate Info (see Figure 3 below) Type: Commercial Onshore Power Wind Turbine Generator: AC Exited double fed Asynchronous Height: 80 meters (263 feet) to Hub Date Operational: July 2016 The GE wind turbine is shown below in Figures 1&2 along with the data plate in Figure 3. This contract does NOT cover the maintenance on the CPC, 1.5 MW turbine. In the future, this turbine may be added to the contract. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |