Similar Projects
High Point University Library
Demolition, New Construction, Infrastructure - 150,000 SF
Design
$80,000,000 CJ est. value
High Point, NC 27262

High Point University Library
Demolition, New Construction, Infrastructure - 150,000 SF
Design
$80,000,000 CJ est. value
High Point, NC 27262

Sandy Ridge Road Water Line Improvements
Infrastructure
Bidding
$900,000 CJ est. value
Greensboro, NC 27235

Crossfield Taxiway - Package 2 Grading
Infrastructure
Bidding
$200,000 CJ est. value
Greensboro, NC 27409

Contractor - New Kiser Middle School - Phase II
Infrastructure, Alteration
Sub-Bidding
$55,000,000 est. value
Greensboro, NC 27408

RFQ Contractor - New Brooks Global Studies Elementary School - Phase I
New Construction, Infrastructure - 80,000 SF
Sub-Bidding
$27,000,000 CJ est. value
Greensboro, NC 27403

Milling and Resurfacing
Post-Bid

Uncg Music Building Exterior Walkway Repairs
Post-Bid
Greensboro, NC 27410

Runway 23L Approach Clearing Project
Results
Greensboro, NC 27400

BB and T Building Wellness Center Renovation Phase 2
New Construction, Renovation
Results
Greensboro, NC 27401

Greensboro Country Club
Renovation, Addition - 52,533 SF
Construction
Greensboro, NC 27408

High Point Country Club Golf and Tennis Building
New Construction - 2,560 SF
Construction
$500,000 to $1,000,000 CJ est. value
High Point, NC 27262

The Resurgent Mixed-Use Development
New Construction, Infrastructure - 275,642 SF
Pending Verification
$60,000,000 CJ est. value
Greensboro, NC 27401

The Resurgent Mixed-Use Development
New Construction, Infrastructure - 275,642 SF
Pending Verification
$60,000,000 CJ est. value
Greensboro, NC 27401

High Point University Dental Building
New Construction, Infrastructure - 80,000 SF
Design
$43,000,000 CJ est. value
High Point, NC 27260

Last Updated 08/14/2022 06:01 AM
Project Title

RFQ Construction Manager at Risk - Windsor Chavis NOCO Community Complex Construction Manager at Risk Services

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27401   (Guilford County)
Category(s) Entertainment/Recreation, Government/Public, Heavy and Highway
Sub-Category(s) Fitness Center, Library - Public, Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Greensboro is issuing a Request for Qualifications (RFQ) to solicit a Statement of Qualifications (SOQ) from contractors interested in the opportunity to submit a proposal to provide pre-construction and construction services for the Windsor Chavis NOCO Community Complex project using the Construction Manager At-Risk (CM@R) method of project delivery. included in the scope of services is collaboration with the design team during the Design Development and Construction Document phase, development of a guaranteed maximum price (GMP) proposal, and, assuming successful negotiation of a GMP with the Owner, ultimately entering into a construction agreement for the construction of the Project. Responses to this RFQ will be evaluated to identify contractors with the requisite experience, qualifications and resources to complete the Project successfully within an agreed upon GMP in accordance with project requirements that will be specified by the Owner. This RFQ will place an emphasis on the contractors demonstrated ability on past projects of similar size and nature, ability to meet project schedule, and commitment to MWBE. All requests for the RFQ and any questions related to the RFQ shall be directed to the City of Greensboro Facilities Division (contact above) in writing via email. The Owner reserves the right to amend the RFQ at any time and only those contractors that have registered with the City of Greensboro Facilities Division will receive amendments. The scope of the project is the construction of a new multi-story Recreation Center and Library (approximately 64,000 sf) as indicated by architectural plans, designs and specifications on City owned property This construction shall include, but not be limited to, exterior grading, erosion control, all associated site and utility work, drainage, parking lot improvements and landscaping. The structure shall also include Telecom/Data, CCTV, Audio Visual, Security and Solar Panel amenities. Amenities typically associated with Libraries and Recreation Centers ie: Library shelving for Media, reading / Research rooms, Computer Stations, Basketball courts, Aquatic Areas to include swimming pool, water slide, break out rooms, Maker Spaces along with Community spaces. The scope of work for the Park will include: New Sports Field, Site Lighting, Concession Areas & Restrooms, walking paths, Children's Play area. The existing walking tunnel under Gate City Blvd, will be updated reconstructed and widened as part of this scope of work as indicated by architectural plans, designs and specifications on City owned property. This construction shall include, but not be limited to, exterior grading, erosion control, all associated site and utility work, drainage, parking lot improvements and landscaping. The City of Greensboro reserves the right to reject any and all SOQs after the opening of SOQs but before award, or any SOQ, in whole or part, when it is in the best interest of the City of Greensboro. For the same reason, the City of Greensboro reserves the right to waive any minor irregularity in a proposal.

Details

64,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment, Athletic Equipment, Exercise Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents