Similar Projects
Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

Meadowbrook Elementary School Parking Lot Improvements
Post-Bid
Golden Valley, MN 55422

Upgrades of ADA Pedestrian Ramps
Results
Minneapolis, MN 55401

South Lake Minnetonka Public Safety Facility Improvements
Results
Shorewood, MN

2021 Parking Structure Rehabilitation
Construction
$2,408,193 est. value
Minneapolis, Saint Paul, MN 55111

Energy Hills, Woodland Ponds, Wintergreen Area Street Reconstruction
Post-Bid
Maple Grove, MN

METRO D Line BRT
Results
MN

Ryan Lake Industrial Park Area, Northwest Area & Lyndale Area Mill and Overlay Improvement
Post-Bid
$2,500,000 to $3,000,000 est. value
Brooklyn Center, MN

Brookdale Park Neighborhood Reconstruction
Results
Less than $5,900,000 est. value
Brooklyn Park, MN 55444

Ridgedale Parking Ramp Repairs
Post-Bid
$935,000 est. value
Hopkins, MN 55305

2021 Street Reconstruction Project Grading, Base, Bituminous Surfacing, Concrete Curb and Gutter, Storm Sewer and Water Main
Results
Less than $4,600,000 est. value
Plymouth, MN

2021 Trail Maintenance
Infrastructure
Post-Bid
Bloomington, MN

Bituminous Overlays on Various Streets and Two Parking Lots
Results
Less than $2,900,000 est. value
Brooklyn Park, MN 55428

Midtown Greenway Trail Reconstruction
Infrastructure
Post-Bid
Minneapolis, MN

Fernbrook Lane/Territorial Road
Results
Maple Grove, MN 55311

Reported 09/29/2021 12:00 AM
Project Title

Asphalt Trail Construction

Physical Address View project details and contacts
City, State (County) Minneapolis, MN   (Hennepin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

To construct new pathways based on a need to realign the existing trail system due to impacts such as roots, existing conditions, or degradation of the trail due to soil erosion or lakeshore impacts

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents