Similar Projects
Challenger Point - Mechanical Renovation
Alteration
Bidding
Fort Collins, CO 80526

Replace Rooftop Air Condenser Unit
Post-Bid
Colorado Springs, CO

Buckley AFB, CO - Comm Ducts to NOSC, B1301
Post-Bid
$1,000,000 to $5,000,000 est. value
Aurora, CO 80012

AHU Project at Denver Air Route Traffic Control Center for HVAC Contractor
Results
$200,000 to $300,000 est. value
Longmont, CO

Plachy Hall HVAC Upgrade & Replacement
Results
Alamosa, CO 81101

FB 2020 RBC HVAC Systems Preventive Maintenance
Post-Bid
Meeker, Rangely, CO 81641

Building Automation/Hvac Replacement Project
Results
Fort Collins, CO 80521

Heating and Plumbing Services
Term Contract
Post-Bid
Arapahoe, CO

Notice 20-01-Rfp-Umc-Bldg-Recommissioning
Results
Less than $800,000 est. value
Boulder, CO

J041--OCC-Data Center A/C Repairs Pop: 09-25-2020 To 09-24-2021
Post-Bid
Denver, CO 80209

NR - HVAC Upgrades Avalon Theatre Lobby and Stage
Results
Grand Junction, CO 81501

HVAC Maintenance Services
Post-Bid
Arvada, Evergreen, Golden, Lakewood, Littleton, Wheat Ridge, CO

Air Conditioning Units
Results
Denver, CO 80203

Districtwide Refrigeration Maintenance and Repair Services
Post-Bid
CO

Annual HVAC Maintenance
Term Contract
Results
Less than $135,000 est. value
Denver, CO 80230

Reported 10/05/2021 12:00 AM
Project Title

USAFA Fy22 Grease Laden Duct Cleaning Service

Physical Address View project details and contacts
City, State (County) State-Wide: CO
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Kitchen hood and vapor exhaust system grease removal services. Work load consists of approximately 50 annual cleanings for 16 separate kitchen area hood systems. Tasks include grease removal for kitchen hoods, filters, ceiling grills, fans, screens, duct work, etc. in accordance with NFPA standards. Performance period is 5 years, 1 April 2022 – 30 March 2027, in a base plus 4-option fixed-price contract. The contractor provides qualified supervision, transportation, equipment, tools, materials, chemicals and other items or services as needed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Duct Accessories, Special Exhaust Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents