Similar Projects
Community Center Expansion - Hastings Parks and Recreation
Addition, Demolition, Infrastructure
Conception
$2,800,000 CJ est. value
Hastings, NE 68901

Replace and Upgrade to 12" Main on 12th Street Marian to Laird - City of Hastings
Infrastructure
Conception
$300,000 CJ est. value
Hastings, NE 68901

WashTech Car Wash / Hastings
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Hastings, NE 68901

City of Hastings Quiet Zone Project Phase II
Infrastructure
Bidding
$400,000 CJ est. value
Hastings, NE 68901

City of Hastings Quiet Zone Project Phase II
Infrastructure
Bidding
$400,000 CJ est. value
Hastings, NE 68901

Lochland Country Club Poolhouse
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Hastings, NE 68901

GTS Officers Quarters Building 635
New Construction, Infrastructure
Post-Bid
$366,800 CJ est. value
Hastings, NE 68901

Parkview Cemetery Paving Phases II and III
Infrastructure
Results
Hastings, NE

CDBG Sidewalks and Curb Ramps Reconstruction
Infrastructure
Results
Hastings, NE

Heartwell Renewables Diesel Production Plant
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Hastings, NE 68901

Replace and Upgrade Main on Marian Road from 7th Street to 9th Street - City of Hastings
Infrastructure
Conception
$350,000 CJ est. value
Hastings, NE 68901

Parkview Cemetery Paving Phase 4 and Mount Sinai Cemetery
Infrastructure
Bidding
$200,000 CJ est. value
Hastings, NE 68901

Construction of Feeder 242 and Installation of Underground Feeders
Infrastructure
Post-Bid
$300,000 CJ est. value
Hastings, NE 68901

District 4 On-Call Util Location Service
Infrastructure
Results
Less than $5,000,000 est. value

7th Street - Chestnut Avenue to Oswego Avenue - City of Hastings
Infrastructure
Conception
$390,000 CJ est. value
Hastings, NE 68901

Last Updated 03/20/2023 10:14 AM
Project Title

2023 Resurfacing Project - Concrete Phase

Physical Address View project details and contacts
City, State (County) Hastings, NE 68901   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Brief description of project: Work includes removal and replacement of approximately 3250 SY of 8-inch concrete pavement, 4900 LF of 30-inch combination curb and gutter, removal and replacement of 800 SY of 5-inch concrete sidewalk, 80 curb ramps, 5 curb or drain inlets, and all other associated work to complete the project. Locations of project include: 7th Street - Chestnut Avenue to Oswego Avenue, 3rd and 4 th Street - East Side Boulevard to California Avenue, Turner Avenue - 12th Street to 13 th Street, and 5 th Street -Baltimore Avenue to Saunders Avenue in Hastings, Nebraska Each bid shall be accompanied by a certified check, drawn on a solvent bank in the State of Nebraska, or a bid bond in an amount of not less than five percent (5%) of the total bid of all contract construction costs, made payable to the City Treasurer of the City of Hastings, Nebraska, as security that the bidder to whom the contract may be awarded will enter into a contract to build all the improvements in accordance with this notice and give bond in the sum hereinafter provided for the construction of improvements. No bid shall be withdrawn after opening of bids without the consent of the City of Hastings, Nebraska, for a period of sixty (60) days after scheduled time of closing bids. Time is of the essence in this contract. In evaluating bid(s) received, the City will consider the timelines of completion of prior construction contracts, existing workload of bidders and available manpower that bidder commits to the project. The successful bidder will be required to furnish a Performance Bond in the sum of the full amount of the Contract within ten (10) days of the date of award. No additional time will be allowed the Contractor for providing the Performance Bond - $250 per calendar day past the final completion date.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents