Similar Projects
Reported | 11/16/2021 12:00 AM |
Project Title | Bus Garage Renovations |
Physical Address | View project details and contacts |
City, State (County) | Hinton, WV 25951 (Summers County) |
Category(s) | Transportation |
Sub-Category(s) | Misc. Structures |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project will consist of three phases. More details will be disclosed at the pre-bid conference which will include engineer designs of the renovation of the bus garage wall. Phase I: Support roof (lvl beam/eye beam) Drill concrete to determine concrete floor depth (Needs to be 8"-12+") Phase II: New rear wall the entire length of bus garage (12" block base (10 courses) leading to 8" block) Restroom will need to be replaced along with hose bib and pipe on rear wall Window needs to be taken out of mechanical room along wall nearest lot and replaced with a door Building needed just outside of newly added door as described above Vent needs removed from Bay 3 ceiling area (steel round pipe) New window needed in Director's office 8x10 building needed in rear of building; relocate and wire 2 air compressors from parts room to building and vent fan Drainage needed around building (need to parge, tar, and include membrane protective material around block) Retaining wall needs to be removed and built back determined on sight. Gutter needs to be rerouted into new drain in order to keep from freezing on ground Grade behind building needs to be cut down in order to deter water away from building Gutter on tire room needs replaced and side of building needs to be covered with soffit Gaps around garage bays need filled and covered/wrapped with a protective covering On rear wall all utilities may need to be relocated (gas, plumbing, electricity) Check on ingress and egress if rear wall windows are taken out Work may need to be done during the evening hours due to bus garage daily usage and possibly weekends Steps need taken out in mechanical room and replaced with 4' wide steps with a landing Drain around building needs to be routed away from building preferably towards storm water Roll of Tyvek wrap to cover exposed area while wall is being built French drain may be needed at top base of lot in order to capture any excess water Phase III: Take down ceiling insulation and sheet rock Insulate (White Spray Foam) ceiling (This potentially could be in Phase II depending on the ability to add new white spray foam insulation to old). Note: Nothing is to be added in order to cover insulation. |
||||||||||||||||||
Details | Misc. Structures, Renovation.
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |