Similar Projects
High School Library
Renovation - 10,000 SF
Design
$1,500,000 est. value
Clayton, MO 63105

2022 Summer Work District Wide - BP C - North High Storm Shelter
Renovation, Addition
Bidding
Chesterfield, MO 63017

Ladue Middle School
Renovation
Post-Bid
Saint Louis, MO 63124

Spoede Elementary School
Addition
Post-Bid
Saint Louis, MO 63141

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Ladue Old Bonhomme Elementary
Renovation
Construction
Saint Louis, MO 63132

Ritenour High School Toilet Room 211
Renovation
Post-Bid
Saint Louis, MO 63114

North Glendale Elementary, Secured Vestibule Renovation Project 2021
Renovation
Results
Kirkwood, Saint Louis, MO 63122

South County Technical High Schools Additions and Alterations
Renovation
Post-Bid
$6,000,000 to $8,000,000 est. value
Saint Louis, MO 63127

Kirkwood High School (KHS) Security Office Renovations Project 2021
Renovation
Results
Kirkwood, MO 63122

Press Box Renovation
Renovation
Post-Bid
Saint Louis, MO

McGrath Elementary School And ECC: Building Package (Phase 1)
New Construction
Results
Brentwood, MO 63144

Affton High School Field
Renovation
Post-Bid
Saint Louis, MO 63123

McGrath ES and ECC Building Package (Phase 1)
New Construction
Results
$15,000,000 to $16,000,000 est. value
Brentwood, MO 63144

Last Updated 01/24/2022 11:33 AM
Project Title

2022 Summer Work District Wide Bid Package A

Physical Address View project details and contacts
City, State (County) Chesterfield, MO   (Saint Louis County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager - 10/18/21
Owner View project details and contacts
Architect View project details and contacts
Description

Package A: Central High Restrooms, Henry Elementary, Oak Brook Elementary, River Bend Elementary Elevator, and West High School For the following Work Categories: General Work Roofing Aluminum and Glass Drywall Flooring Painting Elevator Fire Protection HVAC Plumbing Electrical and Low Voltage Systems

Details

Elementary School, Renovation, Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents