Similar Projects
Redevelopment Opportunity - 1214 Milwaukee Avenue - City of South Milwaukee
New Construction, Infrastructure
Conception
$3,474,055 CJ est. value
South Milwaukee, WI 53172

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$240,000,000 CJ est. value
Milwaukee, WI 53202

South 13th Street Industrial Building
New Construction, Infrastructure - 191,406 SF
Design
$103,000,000 CJ est. value
Oak Creek, WI 53154

IH 41 Airport Freeway
Infrastructure
Bidding
$40,000,000 CJ est. value
Milwaukee, WI 53202

IH 41 Airport Freeway
Infrastructure
Bidding
$40,000,000 CJ est. value
Milwaukee, WI 53202

Private Property Infiltration and Inflow Reduction Municipal Contractors
Post-Bid
Milwaukee, WI

Water Main Relays
Infrastructure
Post-Bid
Milwaukee, WI 53274

68th Street Improvement
Infrastructure
Results
Wauwatosa, WI

2021 Whitefish Bay Blackthorne Place Watermain Replacement
Infrastructure
Results
Whitefish Bay, WI

Eighteen87 On Water Mixed-Use Development
New Construction, Infrastructure - 107,000 SF
Construction
$21,000,000 CJ est. value
Milwaukee, WI 53202

Oakview Parkway Industrial Building
New Construction, Infrastructure - 130,710 SF
Construction
$90,000,000 CJ est. value
Oak Creek, WI 53154

Drew Tower
New Construction, Infrastructure - 80,000 SF
Pending Verification
$50,000,000 CJ est. value
Wauwatosa, WI 53226

Multi-Family Oak Creek Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Oak Creek, WI 53154

Cape Crossing
New Construction, Infrastructure
Design
$85,000,000 CJ est. value
Franklin, WI 53132

Water Main Relays
Infrastructure
Post-Bid
Milwaukee, WI 53225

Last Updated 02/10/2023 03:16 PM
Project Title

FCPP Lynden Hills Biofiltration Basin

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53205   (Milwaukee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Construction Manager - 06/03/22
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project will collect storm water into swales from existing greenspace and pavement and direct it to a biofiltration basin. The storm water will be stored in open storage and infiltrated storm water will be stored in a storage layer underneath engineered soil. The total drainage area for the project is 95,789 SF (2.199 AC). The anticipated disturbance area is approximately 35,047 SF (0.805 AC). The stormwater system will consist of drain tile that will connect to outlet control structure with a restricting orifice that will discharge to existing storm sewer in West McKinley Avenue through an outlet pipe. The work generally includes, but is not limited to: Install and maintain approx. 1400 LF of erosion control measures, earthwork, including approx. 3000 CY of excavation and haul off of some spoils, approx. 2600 ton of stone, grading for the 300 SY bioretention basin, 80 LF of storm piping, 1-48' Manhole and 450 LF of perforated underdrain and approx. 2250 SY of topsoil and seeding for final landscaping, seeding of the bioretention basin, and other miscellaneous items. Pre-Qualification: Yes

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents