Similar Projects
Emerson Avenue Improvements
Design
$27,631,381 est. value
Indianapolis, IN 46204

PCCP Cleaning and Sealing Joints
Infrastructure
Bidding
IN

2021 CCMG Street Improvement
Infrastructure
Bidding
Highland, IN

Marengo Industrial Park Roadway Engineering Services
Post-Bid
Marengo, IN 47140

Downtown Alley Repaving
Post-Bid
Bloomington, IN 47402

Four Porter County Roadway - Project C
Results
Valparaiso, IN 46383

HMA and PCC Pavement Rehabilitation
Results
Indianapolis, IN 46204

2021 Community Crossings
Infrastructure
Bidding
Bristol, IN

2021 County Road Chip Seal-Fog
Post-Bid
Aurora, IN 47001

Hot-In-Place/Heater Scarification Asphalt Surface Recycling Improvements
Results
Less than $300,000 est. value
Cedar Lake, IN 46303

Repair and Resurfacing of Various Streets
Infrastructure
Bidding
Anderson, IN

Term Agreement for On-Call Pothole Patching Services Department of Public Works
Term Contract
Post-Bid
Indianapolis, IN

2020 Street Resurfacing Phase 2
Results
Dunreith, IN 47337

Amtrak - Maintenance Yard Paving
Infrastructure
Bidding
Beech Grove, IN 46107

2020 CCMG Resurfacing
Post-Bid
Windfall City, IN

Last Updated 08/10/2021 01:42 PM
Project Title

Street Improvement

Physical Address View project details and contacts
City, State (County) Roanoke, IN 46783   (Huntington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes construction and/or improvements of street reconstruction; street rehabilitation; curbface sidewalk, curbing, sidewalk, and ADA ramps; replacement of storm sewer; replacement of sanitary sewer (if ordered); casting adjustments and replacements; pavement markings; related appurtenances; and site restoration. Project Areas include Second Street from Main to US 24 (Parts 1 2), Main Street from Vine to Third (Parts 3, 4, and 5), Branson Blvd. from Main to Nancyk (Part 7), Clark Street from Seminary to Smith (Part 8A), and Smith Street from Clark to End (Part 8B).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents