Similar Projects
University of Missouri Indoor Football Practice Facility
New Construction
Conception
Columbia, MO 65211

Chesterfield Sports Complex
New Construction - 98,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Chesterfield, MO 63005

Youth Ballfield Complex
New Construction
Post-Bid
$4,250,000 est. value
Cape Girardeau, MO

Fulton 58 School District-Secure Vestibule Upgrades
Renovation
Post-Bid
Fulton, MO 65251

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Ladue Old Bonhomme Elementary
Renovation
Construction
Saint Louis, MO 63132

Briarcliff Elementary
Renovation, Addition - 10,300 SF
Construction
Kansas City, MO 64116

Indoor Athletic Complex
New Construction
Pending Verification
Saint Louis, MO

Spoede Elementary School
Addition
Post-Bid
Saint Louis, MO 63141

Mark Twain Elementary Gym-Music safe Room and Eugene Elementary Gym-Music safe Room
Addition
Results
Springfield, MO 65807

Fordland Bond Projects
Renovation, Addition
Post-Bid
Fordland, MO 65652

North Glendale Elementary, Secured Vestibule Renovation Project 2021
Renovation
Results
Kirkwood, Saint Louis, MO 63122

Elementary & High School Classrooms
Addition - 5,425 SF
Post-Bid
Silex, MO 63377

Jefferson City HS Athletic Improvements
Renovation
Results
Jefferson City, MO 65101

Reported 12/03/2021 12:00 AM
Project Title

Frontier Schools - Elementary Rehabilitation

Physical Address View project details and contacts
City, State (County) Kansas City, MO 64132   (Jackson County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Elementary School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $15,000,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the renovation of two historic building and the updating of a non- historic gym. The main building will include mostly new MEP in the building, new elevator, new restrooms, and some wall changes. The exterior of the building will primarily include roofing, tuckpointing and some new windows. A second historic building that was a former dormitory will completely internally be demolished and will have new classrooms. The exterior will include tuckpointing and repair, roofing, and ADA accessibility upgrades.

Details

Elementary School, Renovation, Athletic Facility, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents