Similar Projects
Last Updated | 10/11/2022 02:37 PM |
Project Title | WHB Fence Replacement |
Physical Address | View project details and contacts |
City, State (County) | Austin, TX 78721 (Travis County) |
Category(s) | Single Trades |
Sub-Category(s) | Fencing |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2022 |
Bids Due | View project details and contacts |
Estimated Value | $100,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | CONTRACT TERM: This service shall be completed by August 31, 2022.BUDGET: The amount budgeted for this project is $100,000.00. Total contract award cannot exceed this amount. In accordance with the provisions of Texas Government Code 2156.063, Solicitation of Bids, Texas Government Code 2165.001, Custodianship of State Property and the Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is seeking bids to replace 512 feet of fence at the Bolm Rd. Warehouse, located at 6506 Bolm Rd., Austin TX 78721 Provide all materials, equipment, labor, coordination, and supervisory activities necessary to perform the following: Fence shall be 8ft tall Montage Commercial Steel Ornamental Fence System. Fusion-welded and rackable with curved top pickets and operated cantilever gate or similar style. Vendor shall provide specifications and photos or brochure if submitting an alternate. Remove existing fence in place. Chain link fence will be recycled internal to TFC. Furnish and install 512 ft. of 8ft ornamental iron fence with curved pickets. Existing gate operator and controls will be used for entry gate. Concrete barriers will remain with fence built around the barriers (no gaps between barriers and posts). All equipment must be new, factory-sealed and include all product information. Used or refurbished equipment will not be accepted by TFC. Equipment substitutions of equal or better quality and function may be considered at the full and sole discretion of TFC. For any proposed equipment substitutions, respondent shall provide a manufacturers specification sheet with bid. Work shall be performed by trained and qualified personnel. Verification of qualifications will be included with any bid that results from this IFB. Labor installation shall be warranted by Contractor for a period of one-year from the date of acceptance of work by TFC. Materials shall be warranted for 20 years or manufacturer standard warranty, whichever is longer. No gaps may be left in the fence at the end of each workday. Jobsite must be cleaned daily so as not to disrupt employees or normal operations of affected area. Upon completion of the work, area will be cleaned, and all debris accumulated will be removed from job site. TFC reserves the right to change the dates shown below. Attendance at one (1) of the two (2) scheduled jobsite walkthroughs is mandatory. Only those Respondents whose names and represented firm are on the jobsite walkthrough sign-in sheet shall be allowed to submit a response. For the jobsite walkthrough, parking is available at the parking lot of the warehouse. Jobsite walkthrough attendees will be met by the front entrance of the warehouse by a TFC representative and escorted to the jobsite. Please do not be late. Deadline for Submission of Questions - Thursday, April 7, 2022 12:00 Noon |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |