Similar Projects
Isaac's Poultry Market - Build Out
Build-Out - 2,451 SF
Design
Gaithersburg, MD 20878

Park Potomac Mixed-Use Development
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Potomac, MD 20854

Aldi #102 - S Frederick Ave / Gaithersburg
Renovation
Bidding
$310,000 CJ est. value
Gaithersburg, MD 20877

Giant 2313 / Bethesda - Rebid
Renovation - 64,168 SF
Post-Bid
$1,000,000 CJ est. value
Bethesda, MD 20816

Wawa #8536 / Gaithersburg
New Construction, Infrastructure - 5,051 SF
Post-Bid
$1,200,000 CJ est. value
Gaithersburg, MD 20877

Starbucks - Shell
New Construction - 2,500 SF
Construction
$900,000 est. value
Gaithersburg, MD 20879

Future Tenants Shell Pad Building
New Construction - 3,309 SF
Construction
$1,500,000 est. value
Montgomery Village, MD 20879

Shops At Travilah
New Construction - 18,608 SF
Pending Verification
Rockville, MD

Dog Haus
Renovation
Pending Verification

Lidl / Rockville
New Construction, Infrastructure - 30,000 SF
Design
$5,000,000 CJ est. value
Rockville, MD 20855

Charleys Philly Steaks
Build-Out - 2,268 SF
Post-Bid
$150,000 to $200,000 est. value
Germantown, MD 20876

Crumbl Cookies
Renovation - 1,441 SF
Construction
$243,376 est. value
Germantown, MD 20876

Westwood Mixed-Use Development
New Construction, Infrastructure - 280,000 SF
Pending Verification
$200,000,000 CJ est. value
Bethesda, MD 20816

Food Service Equipment Preventative Maintenance and Repairs
Renovation
Post-Bid
Rockville, MD

Aldi #145 / Rockville
Build-out
Construction
$310,000 CJ est. value
Rockville, MD 20852

Last Updated 08/15/2023 05:05 PM
Project Title

Starbucks #703 / Bethesda

Physical Address View project details and contacts
City, State (County) Bethesda, MD 20816   (Montgomery County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Scopes of work include but are not limited to concrete for new slab, casework install, drywall, acoustical ceiling, ceramic tile install, eco grip install, painting, plumbing, HVAC, electric. Other scopes may be needed that are not listed here. Review the plans for the full scope of work. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder. DO NOT contact the owner, architect, or the landlord.

Details

1 Story Above Grade, 2,297 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents