Similar Projects
Whitney Regional Park Continued Improvements - Phase I - PK.24.01 - City of St. Cloud
Demolition, New Construction, Infrastructure, Renovation
Conception
$6,000,000 CJ est. value
Saint Cloud, MN 56303

Whitney Regional Park Continued Improvements - Phase I - PK.24.01 - City of St. Cloud
Demolition, New Construction, Infrastructure, Renovation
Conception
$6,000,000 CJ est. value
Saint Cloud, MN 56303

County Road 136 Apartments
New Construction, Infrastructure
Design
$27,900,000 CJ est. value
Saint Augusta, MN 56301

County Road 136 Apartments
New Construction, Infrastructure
Design
$27,900,000 CJ est. value
Saint Augusta, MN 56301

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Grading, Bituminous Surfacing, ADA Improvements, and Retaining Walls
Results
MN

2021 Park Improvements
Infrastructure
Results
$592,603 CJ est. value
Saint Augusta, MN 56301

Stone Gate Residential Development
New Construction, Infrastructure
Pending Verification
$24,900,000 CJ est. value
Saint Augusta, MN 56301

Stone Gate Residential Development
New Construction, Infrastructure
Pending Verification
$24,900,000 CJ est. value
Saint Augusta, MN 56301

Wastewater Treatment Facility Phase 3 - City of Saint Cloud
Addition, Infrastructure
Conception
$6,630,000 CJ est. value
Saint Augusta, MN 56301

Elbow Lane Retail Development
New Construction, Infrastructure - 11,000 SF
Design
$2,900,000 CJ est. value
Saint Cloud, MN 56303

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Grading, Bituminous Surfacing
Infrastructure
Results
MN

6th Street Office Addition
Addition, Infrastructure - 4,800 SF
Pending Verification
$1,000,000 CJ est. value
Saint Cloud, MN 56303

Last Updated 07/20/2023 02:26 PM
Project Title

Stearns CSAH 75 Resurfacing

Physical Address View project details and contacts
City, State (County) Saint Augusta, MN 56301   (Stearns County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $3,861,868 [brand] Estimate
Plans Available from Agency's Affiliate - 06/09/23
Owner View project details and contacts
Architect View project details and contacts
Description

The furnishing of all labor, materials, equipment, and other incidentals necessary or convenient to the successful completion of the project and the carrying out of all the duties and obligations imposed by the contract upon the contractor. Also used to indicate the construction required or completed by the contractor. A. These provisions shall apply to this contract, which is funded in whole or in part with federal funds 9 and state funds. 10 B. These provisions shall apply to the prime contractor and all subcontractors contracting to do all or part of the work under this contract. 11 C. The provisions established in this document do not necessarily represent all federal, state, and local laws, ordinances, rules and regulations. It is the responsibility of the prime contractor to inform itself and all subcontractors about other regulations that may be applicable to this contract. D. The prime contractor is responsible to ensure that each subcontractor performing work under this contract receives copies of all required contract provisions. 12 These provisions shall be incorporated into written subcontracts and must be displayed on the poster board. 13 E. The department shall administer this contract in accordance with all applicable federal regulations, state statutes and rules14 along with the plans, specifications and provisions, which are incorporated into and found elsewhere in this contract. Site Directions: CSAH 75/2nd Street South between Trunk Highway 15 and Cooper Avenue in St. Cloud Description: Approximate major items of work are: Aggregate Base Class 6 1,173 TON; Bituminous Surfacing 24,125 TON; Reconstruct Drainage Structures 28 EACH; Concrete Walk 1,201 SF; Concrete Curb and Gutter 5,993 LF; Pavement Markings 18,399 LF. A minimum goal of 10.3 % Good Faith Effort to be subcontracted to Disadvantaged Business Enterprises.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents