Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Gravity Sanitary Sewer Lateral Lining Technology Selection
Post-Bid
Sarasota, FL 34236

Rivertown Kendall Drive - Phase 2
New Construction
Post-Bid
Jacksonville, FL

J--Sanitary Sewage Lift Station
Results
West Palm Beach, FL 334106400

Phase I Wastewater Utility Upgrades
Results
Less than $2,703,260 est. value
Freeport, FL

Private Lateral Line Rehabilitation Project
Post-Bid
Saint Petersburg, FL 33731

On-Call Plumbing/Sewer and Drain Services
Results
Tallahassee, FL 32312

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Grand Ridge Sewer Extension Hwy 69
Results
Grand Ridge, FL 32442

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Sanitary Sewer Capacity Improvements
Results
Less than $15,000,000 est. value
Saint Pete Beach, FL 33706

SR 20 Forcemain Upgrade - Lafayette L.S. to South Jackson Street and US-331 Forcemain Repair at Jolly Bay Road
Post-Bid
Santa Rosa Beach, FL

English Oaks Force Main Phase III Section 2C
Results
$2,900,000 est. value
Lakeland, FL 33801

Lincoln Park Water and Sewer Improvements
Results
$1,600,000 est. value
Arcadia, FL 34265

Sanitary Sewer/ Storm Drain Maintenance and Repair
Term Contract
Results
Lauderdale-by-the-Sea, FL 33308

Last Updated 10/20/2020 08:59 AM
Project Title

Force Main Replacement from Lift Station 57 to South Bermuda WRF

Physical Address View project details and contacts
City, State (County) Kissimmee, FL 34741   (Osceola County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be done consists of furnishing all labor, equipment and materials to construct approximately 2,400 linear feet of 24-inch PVC force main including all Ductile Iron Fittings, Valves, restraints and appurtenances, three (3) Air Release Valves with enclosures, and connections at both ends. The connections at the WRF end will consist of one (1) 24-inch wet-tap of the existing 30-inch Ductile Iron Force Main (FM), one (1) 20-inch wet-tap of an existing 20-inch Ductile Iron FM, coupled end connection to the existing 30-inch FM including demolition of existing piping and meter vault, and connection of an existing 6-inch FM to the new 24-inch FM. The connection near the LS end will consist of a direct connection to an existing in-line valve. The project will also include installation of approximately 2,700 linear feet of fiber optic cable within 2-inch PVC conduit and pull boxes spaced no more than 500 feet apart. The fiber optic cable will be terminated at new patch panels at each end at both the LS #57 Electrical Building and the South Bermuda WRF second floor network room in the maintenance and operations building. The project will also include approximately 2,400 square yards of asphalt pavement replacement and site restoration of area previously disturbed. Most proposed work to be completed on TWA owned Property with approximately 600 feet of pipe alignment being constructed within City of Kissimmee Right-of-Way.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents