Similar Projects
Last Updated | 02/23/2023 12:18 PM |
Project Title | Wastewater Treatment Plant Improvements Project |
Physical Address | View project details and contacts |
City, State (County) | Firebaugh, CA 93622 (Fresno County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $16,305,500 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The major work consists of upgrading the City of Firebaugh's Wastewater Treatment Plant to an extended aeration activated sludge plant. Project will construct an aerated lagoon reactor by installing a floating chain aeration system in the existing polishing ponds. The floating chain aeration system will consist of aeration chains with diffuser assemblies. Project will also include the installation of blower for further aeration, two (2) secondary clarifiers, a return activated sludge/waste activated sludge pumping station, sludge dewatering system and storage pad, and constructing effluent storage ponds. Disadvantaged Business Enterprise: DBE/DVBE/MBE/WBE/SBE participation is encouraged $14,000,000 - $16,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Item # 1 Mobilization, Demobilization, Bonds, and Insurance - add the following language to the current bid item description: "This item shall also include all work for preparing, submitting, implementing and maintaining a Storm Water Pollution Prevention Plan. Work includes, but is not limited to preparations of a SWPPP report by a certified QSD, filing of SWPPP documents to SMARTS and obtaining a WDID number for the project, conducting a SWPPP pre-construction meeting and subsequent field inspections by a certified QSP, preparing and uploading project information into SMARTS for event-specific, quarterly, annual, and final report certifications, as applicable. The time for completion is three hundred sixty (360) working days. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |