Similar Projects
Lighting Project Public Safety Complexes
Bidding
Scituate, RI 02857

Public-Private Partnership for Virtual Net Metered Renewable Energy Project
Post-Bid
Scituate, RI 02857

River's Edge Solar Project
Post-Bid
Woonsocket, RI

Scalabrini Piazza Lighting Improvement
Results
Providence, RI 02909

Trailer Mounted LED Light Towers with Built In 6000W Generator
Results
Providence, RI

Emergency Generator Inspection and Repair
Post-Bid
Johnston, RI 02919

Lighting Project at Center General (6 Buildings)
Results
Cranston, RI 02920

Generator Repairs and Maintenance
Post-Bid
Providence, RI 02909

Jenks Middle School Generator Replacement Project
Results
$450,000 est. value
Pawtucket, RI 02860

Town Hall Generator
Post-Bid
Scituate, RI 02857

Lighting Upgrades at DOT Building
Results
Hope Valley, Scituate, RI

Standby Power System/Generator- Police Department
Post-Bid
Johnston, RI 02919

Solar Energy Equipment for Davies High School
Results
Lincoln, RI 02865

Generator Services
Term Contract
Post-Bid
Woonsocket, RI 02895

On-Call Master Electrician
Results
North Providence, RI 02904

Reported 11/30/2019 12:00 AM
Project Title

Replacement of Transformers at the Fox Point Hurricane Barrier, Providence, RI

Physical Address View project details and contacts
City, State (County) Providence, RI   (Providence County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the following components: -Replacement of two existing exterior transformers that currently convert 11KV into 4.160KV. The KVA rating is 12,200 KVA on the OA rating/18,300 KVA on the 6-hour duty cycle rating. -Existing transformers each contain 1820 gallons of PCB-containing oil that weighs approximately 13,500 pounds. -Demolition of existing equipment and furnishing of new fabricated transformers and switches. Demolition and installation of the transformers may involve the demolition and rebuilding of a portion of a masonry wall. -Installation of furnished transformers and switches. -Work shall be scheduled and sequenced to have both high voltage feeds operable during hurricane season (June 1-Nov 1). -New transformers shall match existing equipment in terms of KVA power supplied rating. -New equipment shall be fastened to meet current applicable codes including seismic. -Monitoring of new equipment shall match at least the existing operating parameters (temps, pressures, power, etc) with connections to the existing PLC cabinet in the control room. -Replacement of all ductwork and bus work on the exterior of the control room. -Installation of watertight new ductwork and bus work necessary between the switch and transformer. -Installation of watertight new ductwork and modifications to the bus work from the transformer to the wall of the control room. -New equipment must fit in the existing exterior space and utilize the existing primary feed cabling. -New equipment will utilize the existing grounding system. -Installation of all new cabling from new equipment to PLC in the control room. -New switch shall maintain the existing interlocking connections between the switch and National Grid infrastructure. -Coordinate with National Grid for lockout tagout and testing of new equipment installed.

Details

Division 26 - Electrical, Medium-Voltage Transformers, Low-Voltage Transformers.
Division 33 - Utilities, Utility Transformers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents