Similar Projects
Replacement of Water Heaters and A Boiler
Term Contract
Design
$25,000 to $100,000 est. value
Saint Paul, MN

Replace PLC Controls At Minnesota Correctional Facility
Alteration
Bidding
Faribault, MN 55021

Boiler 3 Tube Installation
Alteration
Bidding
$300,000 est. value
Rochester, MN 55904

Boiler Services
Term Contract
Post-Bid
Moorhead, MN

Boiler and Chiller Replacement
Post-Bid
Woodbury, MN 55125

Chiller and Boiler Water Chemical Treatment Services
Results
Minneapolis, MN

Moose Lake Truck Station Campus - Electrical and Mechanical
Results
Less than $3,250,000 est. value
Moose Lake, MN 55767

Heat Exchanger for 440 St. Paul Chiller Plant
Alteration
Bidding
Minneapolis, MN 55416

Furnish and Install Walk in Cooler and Freezer at Bureau of Criminal Apprehension
Term Contract
Post-Bid
$165,000 to $185,000 est. value
Saint Paul, MN 55106

OWEF - Boiler Repair Services
Results
Rochester, MN 55904

Hospice House Kitchen Renovation
Renovation, Alteration
Bidding
$350,000 est. value
Pipestone, MN 56164

Mechanical Services at MSUM
Term Contract
Post-Bid
Moorhead, MN

Green Acres Building Renovation - North Wing - Mechanical and Electrical
Results
$3,000,000 est. value
Saint Peter, MN 56082

Prior Lake City Hall Boiler Replacement
Alteration
Post-Bid
Prior Lake, MN 55372

Boilers and Water Heaters Replacement
Results
Minneapolis, Saint Louis Park, MN 55426

Reported 06/09/2022 12:00 AM
Project Title

2021 Boiler and Water Heater and Mechanical Upgrades

Physical Address View project details and contacts
City, State (County) Brainerd, MN 56401   (Crow Wing County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project will replace the existing domestic water heater/ boiler (Raypak) and 500 gallon storage tank/tube bundle with new 2000 MBH Aerco Benchmark high efficiency boilers and new double wall plate/frame heat exchangers providing 100% redundancy to the system for system maintenance. Also, the existing Weil McLain 2000 MBH building heating water boiler will be removed and replaced. This will allow the building and domestic hot water system to operate with a total of four (4) 2000 MBH Aerco benchmark boilers at peak loads with one (1) boiler acting as redundant for both systems. Equipment is located within the ground floor mechanical room.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents