Similar Projects
French Broad River Intake and Pumping Station
Infrastructure
Bidding
$10,000,000 to $15,000,000 est. value
Hendersonville, NC

Aviation Parkway Pump Station/Force Main Improvements
Renovation, Infrastructure
Bidding
$1,000,000 to $3,000,000 est. value
Cary, NC 27511

Magnolia Greens Lift Station #1 Relocation
Post-Bid
Leland, NC 28451

On-Call Corrective Maintenance and Repair Service
Term Contract
Post-Bid
Charlotte, NC

Snow Hill Road Pump Station and Force Main Replacement
New Construction
Results
Less than $1,899,449 est. value
Durham, NC 27701

OMC Pump Station and Water Treatment Plant Improvements
Results
Less than $1,000,000 est. value
Burnsville, NC 28714

Grinder Installation Services for DCO Utilities Division
New Construction, Term Contract
Bidding
Durham, NC 27703

Sewer Pump Station No. 1 Improvements
Post-Bid
Walnut Creek, NC 27534

Clems Branch Pump Station Project
Results
$415,633 est. value
Charlotte, NC

Fall Protection System Improvements
New Construction, Infrastructure, Alteration
Bidding
$800,000 est. value
Greensboro, NC

Poplin Road Pump Station Interim Improvements - Design Build Contract
Post-Bid
Monroe, NC 28112

Groometown Road Water Booster Station
Results
Greensboro, NC

Liberty Hill Water Booster Pump Station Relocation
Renovation
Bidding
Albemarle, NC

Public Safety Building Lift Station
Post-Bid
Atlantic Beach, NC

Selma Equalization and Wastewater Pump Station Facilities Flood Resiliency Improvements Project
Results
Less than $900,000 est. value
Smithfield, NC 27577

Last Updated 10/12/2021 09:10 AM
Project Title

Briery Run Pump Station Mitigation

Physical Address View project details and contacts
City, State (County) Kinston, NC 28504   (Lenoir County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the installation of 3 submersible pumps into the existing dry pit, raising electrical equipment and controls above flood elevation (Service Entrance Transformer, Automatic Transfer Switch, 120/208 3-phase Transformer, 120/208 3- phase Panelboard, Seal Water Pump Tank, (3) Furnas Soft Start Panels, Air Compressor Control Panel, Bar Screen Control Panel, Wall Louver Motor Operator, (3) Wet Well Pump NF Disconnects), and installing grating and handrails for operators to reach the elevated electrical equipment.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents