Similar Projects
2022-1 Roadway Improvement Project
Infrastructure
Bidding
$180,000 est. value
Bridgewater, NJ 08807

Overlay and Milling
Infrastructure
Bidding
$713,000 est. value
Warren, NJ

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

2021 Capital Improvement Program- Somerset Street Resurfacing and Signalization Improvements
Infrastructure
Post-Bid
North Plainfield, NJ 07063

King Court and King George Road Improvement Project
Results
Green Brook, NJ 08812

Milling and Paving of Various Roads 2020 Project
Results
Green Brook, NJ

2021 Road Improvement Program
Infrastructure
Post-Bid
$600,000 est. value
Bound Brook, NJ

Roadway Resurfacing Milepost 83 to 122 Section 19 and 20
Results
$20,000,000 to $40,000,000 est. value

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Holland Brook Road West Improvements
Results
Branchburg, Somerville, NJ 08853

Atlantic City Expressway Heavy Highway Job Order Contract
Term Contract
Post-Bid

Maintenance Roadway Contract C213
Results
$10,000,001 to $20,000,000 est. value

Maintenance Job Order Contracting (JOC) Infrastructure Repairs, Central - 2022
Infrastructure
Post-Bid
$10,000,001 to $20,000,000 est. value
Franklin Township, NJ

Maintenance Resurfacing Contract No 523
Results
$5,000,001 to $10,000,000 est. value

Pleasant Plains Road Area Resurfacing
Results
Franklin Township, NJ 08823

Last Updated 05/26/2022 10:55 PM
Project Title

Stony Brook Drive Improvement Project Section I & II

Physical Address View project details and contacts
City, State (County) Bridgewater, NJ   (Somerset County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide construction services which will consist of improvements to the entire length of STONY BROOK DRIVE, including but not limited to milling and resurfacing the pavement with full-depth reconstruction in certain areas, storm sewer upgrades, new accessible ramps, sidewalk replacement, and areas of new curbs and driveway entrance repair. Overall project length is approximately 5,500 linear feet.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents