Similar Projects
Campus Wide Water Fountain Replacement - Bid Package 1 Plumbing
Alteration
Post-Bid
$255,000 est. value
Jonesboro, AR

Thibault Road Relocation
Infrastructure
Post-Bid
$300,000 CJ est. value
Little Rock, AR 72206

IDIQ General Maintenance at Pine Bluff Site Office
Term Contract
Results
Pine Bluff, AR 71601

Sub-Basin S004 Sewer Main Realignment, Rogers Avenue - Waldron to 56th Street
Infrastructure
Results
$1,256,295 CJ est. value
Fort Smith, AR 72903

Pipe, Fittings, and Valves
Term Contract
Post-Bid
Paragould, AR 72450

Wastewater System Improvements - Rebid
Renovation
Results
$3,225,910 CJ est. value
Lake City, AR 72437

Sandy Beach Bathroom Improvements - Material Package - Plumbing
Term Contract
Post-Bid
Heber Springs, AR 72543

Highway 49 and North Oak Street Sewer Extension
Infrastructure
Results
$460,829 CJ est. value
Brookland, AR 72417

Hot Water Heater Replacement for 170 Dwelling Units
Renovation
Post-Bid
$400,000 CJ est. value
Springdale, AR 72764

8-Inch Waterline Replacement
Infrastructure
Results
$130,250 CJ est. value
Waldron, AR 72958

2" Galvanized Water Main Replacements Little Rock Phase 2 2023
Infrastructure
Post-Bid
$2,175,000 CJ est. value
Little Rock, AR 72201

Wastewater Collection System Improvements Phase I - Lift Station and Force Main
Demolition, New Construction, Infrastructure
Results
$6,944,410 CJ est. value
Elkins, AR 72727

Plumbing Repair Project
Renovation
Post-Bid
$200,000 CJ est. value
Warren, AR 71671

MASTER METER GUY WATER WORKS
Infrastructure
Results
$238,250 CJ est. value
Guy, AR 72058

Emergency Water Source Replacement Phase II B Rehabilitation of Booster Pumping Stations
Infrastructure
Post-Bid
$300,000 CJ est. value
Fifty Six, AR 72533

Last Updated 10/18/2023 09:43 AM
Project Title

Salem Road Bridge Reconstruction

Physical Address View project details and contacts
City, State (County) Conway, AR 72034   (Faulkner County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $6,540,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to, 110 LF of three-sided precast culvert bridge, 810 LF of roadway reconstruction with curb and gutter, lighting, drainage structures, drop inlets, reinforced concrete pipe, and reinforced box culverts as shown on the plans and indicated in the specifications. The estimated cost range on this project is between $5,610,000 and $6,540,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents