Similar Projects
Barack and Michelle Obama Elementary - Saint Paul Public Schools
Renovation, Addition
Conception
$10,000,000 est. value
Saint Paul, MN 55126

Education Addition - 2022 Bond - Round Lake-Brewster School
Renovation
Conception
$30,000,000 est. value
Brewster, MN

Ninth Elementary Addition
New Construction
Design
$28,900,000 est. value
Lakeville, MN 55044

Installation of Audio Enhancement and Replacement of Video Cabling
Renovation
Design
$300,000 est. value
Saint Francis, MN

Nutrition Center Office Renovation
Renovation
Bidding
$400,000 CJ est. value
Minneapolis, MN 55411

SPED Toilet Renovations
Renovation
Bidding
$350,000 CJ est. value
Minneapolis, MN 55411

Brookview Elementary
Addition - 16,000 SF
Post-Bid
Woodbury, MN 55129

Otter Lake Elementary
Renovation, Addition
Post-Bid
White Bear Lake, MN

Harley Hopkins 2021 Kitchen Remodel
Renovation
Results
Hopkins, MN 55343

Lucy Laney Elementary - C125 SPED Toilet
New Construction
Results
MN 55412

ISD 194 New Elementary School 9 - Bid Package A
New Construction - 100,000 SF
Construction
$40,000,000 CJ est. value
Lakeville, MN 55044

Jie Mandarin Immersion Addition and Renovation - Part 2 Bid Package #2
New Construction, Infrastructure - 20,000 SF
Construction
$1,298,790 CJ est. value
Saint Paul, MN 55116

New Century School
Renovation, Infrastructure - 55,100 SF
Pending Verification
$4,000,000 CJ est. value
Bloomington, MN 55420

New Elementary School - 2022 Bond - Le Sueur-Henderson Public Schools
Demolition, New Construction, Infrastructure - 90,000 SF
Pending Verification
$39,900,000 CJ est. value
Le Sueur, MN 56058

Bruce Vento School Replacement - Saint Paul Public Schools
New Construction, Demolition
Conception
$20,000,000 est. value
Saint Paul, MN 55130

Last Updated 12/30/2022 04:01 PM
Project Title

Washington Educational Services Building Remodel

Physical Address View project details and contacts
City, State (County) Brainerd, MN 56401   (Crow Wing County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $8,450,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 30th, 2022 construction work began in November of 2022. This project is estimated to be completed in August of 2023. The project consists of multiple work scopes for all of the work necessary for the construction of Washington Educational Services Building Remodel. This Bid package consists of updates to the safe and secure entrances, ADA bathroom updates and indoor air quality improvements. Each Bidder must comply with the following requirements to reassure acknowledgment and recognition of their Bids: Bids must be accompanied by Bid security in the form of a certified check, cashier’s check, or Bid bond in the amount of 5% of the base Bid submitted, made payable to the owner, as guarantee that Bidder will, if awarded, enter into contract in accordance with contract documents and submitted Bid. Submit Bid on the prescribed form, which is furnished with the specification, with full name and address of the Bidder. Completely fill in all blank spaces on the Bid Form, in ink or typewriter, in both words and figures. Sign in longhand, executed by a principal duly authorized to enter into an agreement. If a Bidder is a co- partnership, then signatures on the Bid shall be by an authorized member of the firm, with names and addresses of each member of partnership. Base Bid and all alternate Bids shall be stated both in writing and in figures. In all cases, written and numerical figures must agree; otherwise at Owner’s option, it shall be cause for rejection of Bid. Complete form without alterations. Submit alternate prices (Bids) for either increasing or decreasing the costs, as called for on Bid form and Description of Alternates. Submit a Bid for all alternates. Owner may make such investigations as they deem necessary to determine the ability, competency, and responsibility of the Bidder to perform the work. Any Bidder shall furnish to Owner all such information and data for this purpose, as the Owner may request. Owner reAserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the contract and to complete the Work contemplated therein. The competence and responsibility of Bidder will be considered in making an award, including, but not limited to;; (1) proof of financial responsibility, (2) quality of similar work, (3) amount of experience with similar projects, (4) facilities, personnel and equipment, (5) reputation for performance, and (6) the ability to complete the work within specified time. Owner reserves the right to reject any Bid where there is reasonable doubt as to the qualifications of the Bidder. Owner reserves the right to: (1) accept Bidder’s Base Bid only, (2) accept any one or more of bidder’s Alternate Bids, in any order regardless of the order in which they were listed, (3) reject all Bids, (4) award contract based on their investigation of Bidders, as well as acceptance of alternates, all of which the Owner deems to be in their best interest, (5) waive informalities or minor irregularities in Bids and waive minor irregularities or discrepancies in Bidding procedure. Upon award of Contract, Contractor shall provide AIA A312 Performance and Payment Bonds in the amount of 100% of Contract Sum in accordance with General Conditions and Amendments to General Conditions Each Bidder (including subcontract Bidder where appropriate) is required to visit the site and to fully inform themself and record their own investigations as to the extent of the Work, the extent of the work performed by other contractors under other construction packages, conditions under which the Work is to be performed, existing buildings and streets, conditions of the area, existing utilities and other features, type of soil, available facilities and difficulties that may be encountered in connection therewith, and other relevant items which will affect their Bid or the Work. Prior to submitting a Bid, each Bidder is required to examine all of the bidding requirements, all Contract Documents, all drawings, and specifications for the Project (including those primarily for other Subcontracts). Contractors shall become thoroughly familiar with the scope of the Project and all factors and items of work which will affect their Bid or the Work, whether shown or specified in documents primarily for Work of others or Work of this Contract. No extras will be allowed the Contractor as a result of misunderstanding of the extent of scope of the Work as a result of their failure to study and record their own findings. Submission of a Bid shall be proof that such examinations have been made and that Bidder has recorded their own investigation and has become thoroughly familiar with all contract documents (including all addenda). The failure or omissions of any Bidder to examine any form, instrument or document shall in no way relieve any Bidder from any obligation in respect to their Bid. Nor shall it be the responsibility of ICS or its counterparts to ensure you have read all documentation. This is the sole responsibility of the Bidder and its Sub-Contractor(s) Work will begin after receipt of the signed contract from the Owner. The anticipated award date is July 7, 2022. Preconstruction and submittals work related to the project is to commence immediately after receipt of the signed contract. The onsite work will begin on the premises no later than October 3, 2022 Owner requires all work to be substantially completed by August 7, 2023

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents