Similar Projects
Floor Cleaning - Pope Army Air Field
Post-Bid
Fayetteville, NC 28308

Educational Resource Center VCT Replacement
Post-Bid
Fayetteville, NC 28301

NCMA Flooring Replacement - Fort Bragg
Results
Fort Bragg, NC

56--Modular Raised Floor for Operation Center
Results
Fort Bragg, NC 28306

Margaret Willis Elementary School Media Center Replace Carpet with VCT
Post-Bid
Fayetteville, NC 28305

VCTY Replacement at Pauline Jones School
Post-Bid
Fayetteville, NC 28301

Floor Stripper and Finish
Post-Bid
Fayetteville, NC 28302

Fort Bragg Floor Repair
Post-Bid
Fort Bragg, NC 28310

Gray's Creek Elementary School - VCT Replacement
Post-Bid
Hope Mills, NC 28348

Hope Mills Middle School - VCT Replacement
Post-Bid
Hope Mills, NC 28348

William H. Owen Elementary School - VCT Replacement
Post-Bid
Fayetteville, NC 28304

Margaret Willis Elementary (Admin Area) - VCT Replacement
Post-Bid
Fayetteville, NC

Remove and Replace Fayetteville FMS11 Facility Floors
Post-Bid
Less than $44,575 est. value
Fayetteville, NC 28306

Remove and Replace Facility Floors in Classroom - NCMA Fort Bragg
Post-Bid
Fort Bragg, NC 28310

Remove and Replace Flooring, Ceiling Tiles, and Paint Walls - Fayetteville Readiness Center
Post-Bid
Fayetteville, NC 28306

Reported 06/05/2020 12:00 AM
Project Title

Pine Forest Middle School - VCT Replacement

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28311   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

VCT is to be installed by contractor in five rooms 40-43, and room between 41 & 43. Installation of Vinyl Composition Tile (VCT) 1. Contractor to install 12” x 12” VCT. 51899 2. Up to 10% allowance for Accent Color Tile 3. Contractor will skim coat floor surface before installing VCT. 4. Contractor will install 6” Black rubber cove base. 5. Contractor will roll all VCT once install. 6. Contractor will be responsible of disposal of all materials. 7. CCS will move all furniture as needed.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents