Similar Projects
Site Development and Construction of East Terminal Building at H.L. "Sonny" Callahan Airport
New Construction, Infrastructure
Post-Bid
Fairhope, AL 36532

PYP Centre Apron Expansion
Addition
Results
$449,000 est. value
Centre, AL 35960

Runway Safety Area Improvements
Renovation
Post-Bid
$1,300,000 to $1,600,000 est. value
Andalusia, AL 36421

Improvements to Ozark-Blackwell Field Airport
Construction
Ozark, AL 36360

Isbell Field Airport Apron Rehabilitation
New Construction
Post-Bid
Fort Payne, AL 35968

Bus Shelter Stop Pad Installation and Related Maintenance
Term Contract
Post-Bid
Birmingham, AL

Design/Build Services for New Receiving Building
New Construction - 6,000 SF
Results
Less than $100,000 est. value
Birmingham, AL 35212

Checked Bags Resolution Area Expansion
Addition
Post-Bid
Birmingham, AL 35212

Improvements to the Demopolis Regional Airport
New Construction
Post-Bid
Demopolis, AL

MAA TSA Remodel
Renovation
Post-Bid
Mobile, AL 36608

Mobile Downtown Airport International Terminal
New Construction
Conception
$62,000,000 est. value
Mobile, AL 36615

Construction of a New Wash Rack
New Construction
Post-Bid
$580,000 est. value
Mobile, AL 36615

Mobile Downtown Airport Terminal Apron Reconstruction Phase 1 BP-3
Renovation
Post-Bid
$1,326,000 est. value
Mobile, AL 36615

Reported 05/27/2022 12:00 AM
Project Title

Construction Manager at Risk - Terminal and Concourse Improvements Project

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35824   (Madison County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Terminal and Concourse Improvements Project at the Port of Huntsville, 1000 Glenn Hearn Blvd SW, Huntsville, AL 35824.

Details

Airline/Passenger Terminal, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents