Similar Projects
Upgrade or Ventilation Fy22 NRM
Alteration
Design
$1,000,000 to $5,000,000 est. value
Loma Linda, CA 92354

EHRM Infrastructure Upgrades Design-Build
Infrastructure
Design
$10,000,000 to $20,000,000 est. value
McClellan, CA 95652

Industrial 12kV Underground Conversion
Alteration
Bidding
$175,000 est. value
Roseville, CA 95678

South Lake Tahoe Area Office- Heating, Ventilation, and Air Conditioning (HVAC) Maintenance
Term Contract
Bidding
South Lake Tahoe, CA 96150

H--LBAO Generator Maintenance Services
Term Contract
Post-Bid
Carson City, Nixon, NV 89424

Emergency Backup Generator
Alteration
Post-Bid
CA

Better Way Electrical Service or HVAC Project
Alteration
Results
$100,000 to $300,000 est. value
Yuba City, CA 95991

Better Way Electrical Service or HVAC Project
Alteration
Results
$100,000 to $300,000 est. value
Yuba City, CA 95991

Replace Historic Scotty's Castle Climate Control System
Infrastructure
Design
$5,000,000 to $10,000,000 est. value
CA

City Hall Mechanical Replacement Project Phase II
Term Contract
Bidding
$5,895,000 est. value
San Francisco, CA

Uninterruptable Power Supply (UPS) Systems
Alteration
Post-Bid
Fresno, CA

2210 Napa-Vallejo Highway Temporary Construction Power
Alteration
Results
$75,000 est. value
Napa, CA 94559

Phoenix Area Facilities Technical Specialist Services
Term Contract
Bidding
Phoenix, AZ - Winterhaven, CA

J041--VA Palo Alto Health Care System Chiller and Cooling Tower Maintenance Services
Term Contract
Post-Bid
Livermore, CA 94550

EMS Upgrades at the Main Library
Alteration
Results
$347,500 est. value
Burlingame, CA 94010

Last Updated 03/31/2022 10:35 AM
Project Title

Rio Plaza Elementary School HVAC and Electrical Replacements

Physical Address View project details and contacts
City, State (County) Oxnard, CA 93030   (Ventura County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $58,520
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents