Similar Projects
Transportation Surface Drainage and Ongoing Rehabilitation
Infrastructure
Bidding
$1,238,375 est. value
LAUD LAKES, FL 33330

Add Left Turn Lane(s) - Paved Shoulders - SR 71
Infrastructure
Bidding
$563,027 est. value
FL

Surf Road Reconstruction & Beach Hardening
Infrastructure
Sub-Bidding
Hollywood, FL 33021

Construction Services
Post-Bid
FL

CR 127 Rehabilitation Project - Phase 1
Post-Bid
FL

SCOP Repaving/Overlay Project
Results
La Belle, FL 33935

FY 2020 Street Rehabilitation
Results
Less than $1,271,736 est. value
Pensacola, FL 32502

Intersection Improvement - Bidirectional Median - Widening -SR 25 (US 27)
Infrastructure
Bidding
$656,355 est. value
FL

District 3 Asphalt Paving 2020
Post-Bid
FL

2020 Roadway Repaving
Results
Less than $288,772 est. value
Ormond Beach, FL 32173

Add Lanes and Rehabilitate Pavement/New Bridge Construction-Sr 25 (Okeechobee rd)
New Construction, Infrastructure
Bidding
$107,176,635 est. value
FL

Civil/Site Construction Services
Post-Bid
FL

Sumter County C-478 Widening Between US 301 and SR 471
Results
Less than $4,498,933 est. value
FL

Brickyard Road Resurfacing
Infrastructure
Bidding
Chipley, FL 32428

Fort Denaud Road Improvements from SR 80 to Fort Denaud Bridge Way
Post-Bid
Less than $1,200,798 est. value
LaBelle, FL 33935

Reported 09/26/2021 12:00 AM
Project Title

Eglin Construct Range Road 218 Bypass

Physical Address View project details and contacts
City, State (County) Eglin AFB, FL   (Okaloosa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The U.S. Army Corps of Engineers, Mobile District, anticipates the construction of a new, two lane paved bypass road along the northern boundary of existing test area (TA), range D-51 at Eglin Air Force Base. The new road will intersect Range road 218 at the southwest and northeast corners. The bypass road will be constructed outside of the controlled perimeter north of the range boundary. Construction will include land clearing and grubbing, rough and finish grading, earthwork, fill and compaction, drainage ditches, concrete culverts, hydro-seeding, new asphaltic concrete pavement, striping, signage, reflective pavement markers, and best management practices.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents