Similar Projects
Refrigeration Preventative Maintenance Sacramento and Yolo Counties
Alteration
Bidding
Sacramento, CA

Bannon Creek School Roof Replacement Project
Alteration
Bidding
$360,000 est. value
Sacramento, CA 95833

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Alerton Variable Air Volume Controllers Replacement and Unscheduled Repair Services for Sacramento DMV Headquarters
Alteration
Results
$224,520 est. value
Sacramento, CA 95818

Roof Replacement for 14 Roofs
Alteration
Results
$700,000 est. value
Sacramento, CA 95827

SCUSD Luther Burbank HS Pool Replacement and Locker Room Renovation
Renovation, Infrastructure
Bidding
$2,500,000 est. value
Sacramento, CA 95823

B727 Air Handler
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
Mather, CA

Arcade Fundamental Middle School New Construction
New Construction
Results
$53,000,000 est. value
Sacramento, CA 95821

Lease-Leaseback Construction Services Kit Carson HVAC Replacement Project
Alteration
Bidding
$2,400,000 est. value
Sacramento, CA 95819

West Side Hvac Repairs Uscg Airsta Sacramento
Alteration
Post-Bid
McClellan, Sacramento, CA 95652

Roofing
Alteration
Bidding
$200,000 est. value
Sacramento, CA

CCC Bercut Center HVAC PM Services
Alteration
Post-Bid
Sacramento, CA 95811

PSAB Roof Cole Building
Alteration
Bidding
$200,000 est. value
Sacramento, CA

Rio Americano High School CTE Modernization
Renovation, Alteration
Post-Bid
CA

Reported 05/17/2022 12:00 AM
Project Title

Lease-leaseback Construction Services for Fern Bacon, Albert Einstein and John Still Middle School Reroof and HVAC Replacement

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95823   (Sacramento County)
Category(s) Education, Single Trades
Sub-Category(s) HVAC, Middle/Senior High School, Roofing
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Request for Proposals (RFPs), Construction Start Expected June 2022, Construction Completion Expected September 2023
Bids Due View project details and contacts
Estimated Value $900,000
Plans Available from Construction Manager as Agent (CMa)
Owner View project details and contacts
Architect View project details and contacts
Description

renovation of a educational facility. Questions regarding this RFQ/P may be directed to Chris Ralston, chris-ralston@scusd.edu and cc: Meridith.Holloway@Vanir.com and Jordi.Rodriguez@Vanir.com and must be submitted in writing on or by 10:00 a.m., Wednesday, May 4, 2022. Description: HVAC Replacement and Replacement of Built up with Single Ply Roofing Project Project Estimate: $900,000 each project Anticipated Completion Date: September 1, 2023

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents