Similar Projects
MedMen - Herkimer Road / Utica
New Construction, Infrastructure - 8,600 SF
Conception
$13,000,000 CJ est. value
Utica, NY 13502

The Tech Barn at Marcy Nanocenter - Mohawk Valley EDGE
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Marcy, NY 13403

Tidal Wave Car Wash / New Hartford
Demolition, New Construction, Infrastructure
Design
$1,300,000 CJ est. value
New Hartford, NY 13413

Pavement Rehabilitation, NYS RTE 921E and 921T
Infrastructure
Bidding
$4,100,000 CJ est. value
New Hartford, NY 13413

Pavement Reconstruction, RTE. 921W
Infrastructure
Bidding
$3,000,000 CJ est. value
Yorkville, NY 13495

700 Broad Street Apartment
Demolition, Infrastructure, Build-out, Renovation
Sub-Bidding
$14,000,000 CJ est. value
Utica, NY 13501

Bureau of Design and Construction Project Barge Canal at Cove Rd Boat Launch
Infrastructure
Post-Bid
$1,700,000 CJ est. value
Durhamville, NY 13054

2022 Pole Barn
New Construction, Infrastructure
Post-Bid
$115,000 CJ est. value
Sherrill, NY 13461

New York State Office of Mental Health Central New York Psychiatric Center Building 39 Steam Tunnel Repair
Renovation
Results
$135,000 to $165,000 est. value
Marcy, NY 13403

Replacement of the Judd Road Bridge Over Nys Thruway at Milepost 240.48
Demolition, New Construction, Infrastructure
Results
$4,843,935 CJ est. value
Whitestown, NY 13424

Infrastructure Rehabilitation Vernon District B0115
Renovation, Infrastructure
Pending Verification
$600,000 CJ est. value
Vernon, NY 13476

Parking Facility Rehabilitation BPF36
Infrastructure
Pending Verification
$200,000 CJ est. value
Vernon, NY 13476

Stewarts Shops/Utica
Demolition, New Construction, Infrastructure - 3,975 SF
Design
$1,049,400 CJ est. value
Utica, NY 13502

Clubhouse Addition and Alterations for The Valley View Golf Course - Contract #1 - General Construction
Addition, Demolition, Renovation, Infrastructure - 22,575 SF
Bidding
$268,000 CJ est. value
Utica, NY 13501

Construction of New Sidewalks and Related Work at City Hall
Infrastructure
Post-Bid
$300,000 CJ est. value
Utica, NY 13502

Last Updated 01/11/2023 06:09 PM
Project Title

Hawkinsville Dam Remediation

Physical Address View project details and contacts
City, State (County) Boonville, NY 13309   (Oneida County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Service-Disabled Veteran-Owned Set Aside: No Contract term: four months A Bank check or bid bond in an amount not less than five percent (5%) of the amount of the bid shall accompany each bid. Work is anticipated to begin August 2022. Last Day to Submit Request for Clarifications April 15, 2022 Substantially Complete Work December 15, 2022 The Board reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Board that such Bidder is properly qualified to carry out the obligations of the Contract and to complete the Work contemplated therein. Conditional bids will not be accepted. Project Location : Hawkinsville Dam Hamlet of Hawkinsville, Town of Boonville Oneida County, New York Latitude 43.4932 N Longitude -75.2755 W The Hawkinsville Dam Remediation Project seeks to increase the spillway length to pass the spillway design flood (SDF) and improve the dam abutments. The project is located immediately upstream (south) of the Hawkinsville Road Bridge on the Black River in the Hamlet of Hawkinsville, Town of Boonville, Oneida County, New York. Hawkinsville Dam is a run-of-river facility consisting of a 298-foot-long concrete spillway, an abandoned concrete intake structure, and two abandoned wooden sluice gates. The elevation of the right abutment is 1,049.1 feet; the elevation of the left abutment and intake is 1,049.2 feet; and the elevation of the spillway is 1,044.1 feet. The intake structure formerly conveyed water to a 5.5- foot-diameter metal penstock for use at the excelsior mill. The intake has a metal trash rack oriented perpendicularly to the flow in the impoundment to prevent debris from entering the penstock. The penstock is severed a few feet downstream of the dam and is no longer connected to any structure. The forebay is filled, and a non-functioning gate obstructs the upstream end of the penstock. Water leaks through the fill material and gate and through the remaining penstock to the river downstream

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents