Similar Projects
RFP - Environmental Consulting - Site
Term Contract
Conception
Columbia, SC 29201

RFP - State Site Assessment and Remediation Program
Term Contract
Conception
Columbia, SC 29201

Bus Driver Lounge Renovation 2 - ReBid
Renovation
Design
$54,502 CJ est. value
Columbia, SC 29201

Renovation 5th Floor Short
Renovation
Bidding
$280,000 CJ est. value
Columbia, SC 29201

Brown Building - SFBFSI-CFD - 3rd Floor Renovation
Renovation - 890 SF
Post-Bid
$80,000 CJ est. value
Columbia, SC 29201

Task Order Contract - General Construction Services
Post-Bid
Columbia, SC

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

D/B Southeast MATOC - Phase 2
Results
$1,000,000 to $170,000,000 est. value

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Results

South Carolina Construction IDIQ
New Construction, Renovation, Addition
Post-Bid
$250,000 to $3,000,000 est. value

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

Headquarters Elevator Modernization
Renovation
Post-Bid
$150,000 to $250,000 est. value
Columbia, SC 29210

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

Construction MAC; Southeast
New Construction, Renovation
Post-Bid
Less than $48,000,000 est. value

Last Updated 09/26/2022 11:41 AM
Project Title

RFQ - Turnkey Long-Term Care (LTC) Recert Surveys

Physical Address View project details and contacts
City, State (County) Columbia, SC 29201   (Richland County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected March 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Start date: 10 / 01 / 2019 End date: 9 / 30 / 2021. Dates provided are estimates only. Any resulting contract will begin on the date specified in the notice of award. See clause entitled Term of Contract - Effective Date/Initial Contract Period. [01-1040-1] The resulting contract is for One (1) Year, with one (1) Year renewal option, for a possible maximum term of Two (2) Years. For RFQ - Turnkey Long-Term Care (LTC) Recert Surveys QUESTIONS MUST BE RECEIVED BY: 8 / 29 / 2019 - 5:00 PM ET (See Questions From Offerors provision) The method of contractor selection has not been determined at this time.Request for proposals for design services is underway.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents