Similar Projects
2nd Street Southeast
Bidding
Willmar, MN 56201

Meyers Brothers - Phase 1 Improvements
Bidding
Less than $2,020,000 est. value
Moorhead, MN 56560

2021 Stabilize And Pave Road Bed
Post-Bid
MN

DNR2 Aitkin Area Road Grading
Term Contract
Post-Bid
Aitkin, MN

Hwy 52 Zumbrota to Cannon Falls
Results
$54,000,000 to $60,000,000 est. value
MN

9101 FEMA County Road Repair
Results
MN

2021 Micro Surfacing
Bidding
$450,000 est. value
Apple Valley, MN

2021 Street Maintenance
Post-Bid
Saint Louis Park, MN

2021 Jo Nunn Park Trail
Results
Champlin, MN 55316

CSAH 3 (Olinda Trail North)
Bidding
Scandia, MN

Hot Poured Joint Sealer
Term Contract
Post-Bid
Minneapolis, MN

Old Village Phase 5 And 6 Street, Drainage and Utility Improvements
Results
MN

CSAH's 1 and 6 - Shoulder Preparation, Shoulder Base Aggregate
Bidding
Litchfield, MN

2021 Bituminous Resurfacing
Post-Bid
MN

Reclaim and Overlay
Results
MN

Last Updated 03/29/2021 05:51 AM
Project Title

Glacial Lakes State Trail

Physical Address View project details and contacts
City, State (County) New London, MN   (Kandiyohi County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,222,770
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of new bike trail and rehab of existing bike trail from Hwy 71 Tunnel thru Sibley State Park and ending near the beach area. Total length of work of base bid is 2.43 miles. Major Work Items Include: Clear and Grub-3 acres; Preassembled Silt Fence-6,374 LF;Excavation-6,496 CY; Granular Borrow-1,800 CY;Grade and Compact Subgrade-20,921 SY; Aggregate base- 20,066 SY (12 in thick); Bituminous Removal-3,588SY; Bituminous surface-14,864 SY; Curb & Gutter-799 LF; Concrete (6" thick)-1,154 SF;Boulder Retaining Wall-1,272 SF: Erosion Blanket-17,796 SY; Concrete Pipes-146 LF; Corrugated Aluminum Steep Pipes-396 LF; Landscaping with hydraulic mulch, seed, Hydraulic Matrix. C. Description of Alternates: Continuation of bike trail construction for 0.6 miles and construction on campground road.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents