Similar Projects
Water, Sanitary Sewer and Storm Sewer to Serve Enclave at Dobbin Section 2
Infrastructure
Bidding

Regional Detention Basin and Storm Sewer to Serve 71 Acre Townsen Development
Infrastructure
Bidding
Houston, TX

Rehabilitation of Outfall 32
Post-Bid
Hunters Creek Village, TX 77024

I-45 Scarsdale Business Park
Post-Bid
Houston, TX 77002

Construction of the Southbelt (Phase 3) and Dagg Road Stormwater Detention Basins
Results
Less than $16,957,294 est. value
Houston, TX 77092

Cleaning of Storm Sewer Inlets, Pipes and Boxes
Term Contract
Results
Houston, TX 77002

Storm Sewer, Sanitary Sewer and Water Lines to Serve Morton Creek Ranch Sections 24 and 26
Infrastructure
Bidding
TX

Storm Water Pump Repair - Houston District
Post-Bid
Houston, TX 77007

Water Distribution, Wastewater Collection and Storm Water Facilities to Serve Cypresswood Landing, Section Two
Results
TX

Storm Sewer Cleaning Program
Post-Bid
Houston, TX 77005

The Groves, Section 33 Water, Sanitary Sewer, and Storm Sewer Facilities
Results
Less than $1,592,987 est. value
TX

Water, Sanitary Sewer, Storm Sewer, and Paving Improvements for Heritage Crossing
Post-Bid
Houston, TX 77004

Water Distribution, Wastewater Collection and Storm Water Facilities to Serve Marcello Lakes, Section Three
Results
TX

Water Distribution, Wastewater Collection, Storm Water Facilities and Gas Line to Serve Raburn Reserve Section One
Post-Bid
TX

Construction of the Groves, Section Thirty-Four Water, Sanitary Sewer, and Storm Sewer Facilities
Results
Less than $1,762,593 est. value
TX

Last Updated 07/15/2021 05:21 AM
Project Title

Utility Extension to Serve Colonial Parkway

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope shall include installation of approximately 935 LF of 60” RCP Storm Sewer, remove and dispose of existing 95 LF of 60” CGMP Storm and clean and fill existing 850 LF of drainage ditch.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents