Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Roadway Rehab to Mitigate Highway Settlement, Construct Aux Lane
Infrastructure
Design
$44,537,000 est. value
San Diego, CA 92124

FY21-22 Pavement Rehabilitation Overlay and Slurry Seal Project
Term Contract
Bidding
$1,025,000 est. value
Encinitas, CA

Slurry Seal Group 2222
Infrastructure
Bidding
$5,100,000 est. value
San Diego, CA

Parking Lot Seal And Stripe Services
Infrastructure
Post-Bid
$65,000 est. value
San Diego, CA 92117

Street Preventive Maintenance
Alteration
Post-Bid
$420,000 est. value
Coronado, CA

Slurry Seal Services
Infrastructure
Results
Vista, CA 92081

ADP Airside Improvements
New Construction, Renovation, Infrastructure, Alteration
Results
$270,000,000 est. value
San Diego, CA

Helix 9 Flow Control Facility
New Construction, Infrastructure
Design
$6,000,000 to $8,000,000 est. value
San Diego, CA

FY21-22 Pavement Rehabilitation Overlay and Slurry Seal Project
Infrastructure
Bidding
$1,300,000 est. value
Encinitas, CA

Minor B - Sb - Install Mgs
Infrastructure
Post-Bid
CA

Pershing Drive Bikeway Project
Infrastructure
Results
$12,980,675 est. value
San Diego, CA 92101

Butterfly Valves for Ramona Pipeline Valve Replacement - 5886410
Infrastructure
Design
$800,000 est. value
San Diego, CA 92101

Gillespie Field Vehicle Service Road to West Transient Ramp Project
Infrastructure
Bidding
$950,000 to $970,000 est. value
El Cajon, CA 92020

Pavement Rehabilitation
Infrastructure
Post-Bid
$268,000 est. value
San Diego, CA 92104

Reported 07/08/2022 10:26 AM
Project Title

Cole Grade Road - San Diego County

Physical Address View project details and contacts
City, State (County) Valley Center, CA 92082   (San Diego County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected October 2022, Construction Completion Expected August 2024
Bids Due View project details and contacts
Estimated Value $29,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will widen Cole Grade Road from Horse Creek Trail to the Valley Center High School. This project was requested by Community Planning Group. This project is included in the San Diego County's FY 2021-2025 Capital Improvement Plan (CIP). As of July 7, 2022, information regarding a design team or a general contractor is not available. Construction is anticipated from 2022 to 2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents