Similar Projects
Hebrew Senior Life
New Construction
Conception
Brookline, MA 02446

Plymouth Rubber Redevelopment Buildings 5 & 6
New Construction - 650,480 SF
Conception
Canton, MA 02021

Puddingstone at Chestnut Hill
New Construction, Renovation - 442,216 SF
Design
Brookline, MA 02467

East Milton Square Mixed Use
New Construction - 18,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Milton, MA 02186

1684 Beacon Street
Renovation - 8,690 SF
Sub-Bidding
$2,000,000 est. value
Brookline, MA

Modernization of Teresa J. Morse Apartments - Filed Sub Bids
Results
Less than $18,200,000 est. value
Brookline, MA 02446

Entry Door Replacement McRae 667-1 & 667-2, Elderly Development
Renovation
Results
$338,549 est. value
Braintree, MA 02184

Timber Crest Estates
New Construction
Construction
$61,448,981 est. value
Medway, MA 02053

Willows at Medway
New Construction - 11,472 SF
Construction
$60,310,000 est. value
Medway, MA 02053

Colonial Village Apartments
Renovation
Pending Verification
Weymouth, MA 02188

Sharon Gallery
New Construction - 984,117 SF
Pending Verification
$142,822,000 est. value
Sharon, MA

Washington Street Units
Renovation, Addition - 12,000 SF
Design
Dedham, MA

Kickham Apartments First Floor Office Reconfiguration
Renovation
Results
Less than $100,000 est. value
Brookline, MA 02446

JFK Crossing
New Construction, Renovation - 5,000 SF
Construction
$8,000,000 est. value
Brookline, MA 02446

Harbor Village
New Construction - 49,218 SF
Pending Verification
Cohasset, MA

Last Updated 07/14/2021 09:02 AM
Project Title

Unit Bathroom Modernization, O'Brien Development MA 40-10 - General Bids

Physical Address View project details and contacts
City, State (County) Dedham, MA   (Norfolk County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $389,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. The Project consists of: Unit Bathroom Renovations including, but not limited to: removal of fixtures, finishes and accessories and installation of new. 22 unit full bathrooms and 4 half bathrooms are to be renovated. Asbestos has been found in the wallboard joint compound

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents