Similar Projects
Fire Station
New Construction
Conception
McQueeney, TX 78123

New Fire Department Headquarters
New Construction
Conception
McKinney, TX

Fire Station 41 Replacement
New Construction
Design
Dallas, TX 75230

Inter Community Volunteer Fire Department - New Sub Station No. 2
New Construction - 2,400 SF
Bidding
$385,000 to $415,000 est. value
Carthage, TX 75633

Joint Use Police Substation Remodel Project
Renovation
Bidding
Plano, TX 75025

Pearland Fire Station No. 8
Post-Bid
Pearland, TX

New Channelview Fire Training Services Facility
New Construction - 5,508 SF
Post-Bid
Less than $1,250,000 est. value
Channelview, TX 77530

Renovation of the Old Fire Station No 12 Facility
Renovation
Results
$1,000,000 est. value
Fort Worth, TX

Design-Build for Vehicle Maintenance Facility
Results
Less than $15,800,000 est. value
TX

Fire Station 6
Construction
League City, TX

Aldine Fire Rescue Station No. 11
New Construction - 15,185 SF
Construction
Houston, TX 77032

Police Headquarters Fleet Elevator Modernization (Bond 2018)
Bidding
Corpus Christi, TX 78401

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

Renovation of Old Police Building
Renovation
Results
Fair Oaks Ranch, TX 78015

Fire Department Administration Building and Station
Construction
$3,250,000 est. value
Stafford, TX

Last Updated 04/19/2021 08:00 AM
Project Title

Fire Station No. 6

Physical Address View project details and contacts
City, State (County) San Marcos, TX 78666   (Hays County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,502,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of services consist of new construction of a proposed approximate 12,400 square feet Fire Station #6and corresponding site improvements and paving. The new fire station is a 33 feet tall two-story building consisting of approximately 11,000 square feet of finish out first floor and 1,400 square feet of shelled space second floor. Utilizing the same architect, WestEast Design Group, the City chose to replicate the design of the recently completed new Fire Station #2 at the La Cima subdivision with minor revisions to site adapt and account for lessons learned during construction of the previous station. The scope of work also consists of off-site utility improvements to extend domestic water and sanitary sewer lines to the site. The off-site improvements consist of approximately 950 linear feet of 12 inch domestic water line and 400 linear feet of 8 inch sanitary sewer line.

Details

1 Fire/Police Station, Approximately 12,400 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents